Laserfiche WebLink
I I ._ rJU9\MEf_'HAIIIfAL\iAfJP°5Vo0U9Jk 12.GWG bate/N,, 03/0` 1,L- _ .:a1 . 1_1.. ., <br />SheetiV�I/�} <br />Sheet Notes <br />4. - PIPING TESTING: TESTING <br />BOOT IN T14E SUMP IS <br />OF THE SECONDARY CONTAINMENT PIPING IS REQUIRED. THE SEALING 13. <br />TO BE INSTALLED WITH THE VALVE TURNED DOWN. AFTER <br />- U.G. CONDUIT: ALL U.G. CONDUIT TO TANKS SHALL BE <br />RIGID STEEL GALVANIZED (RSG) <br />8 - PREFABRICATED ASSEMBLIES: A CERTIFICATE OF APPROVAL SHALL BE FURNISHED WITH EACH <br />SCHEDULE 40. <br />TESTING THE VALVE IS <br />TO BE OPENED TO ALLOW DRAINAGE OF THE SECONDARY PREFABRICATION ASSEMBLY, CERTIFYING THAT THE ASSEMBLY OR STRUCTURE IN QUESTION HAS <br />. - SUMP PIPING PENETRATIONS: <br />PIPING TO THE SUMP <br />MONITOR PROBE. BEEN INSPECTED MEETING THE REQUIREMENT OF THE CODE, <br />SUMP PIPING PENETRATIONS SHALL BE MADE USING <br />BULK HEAD FITTINGS <br />5. - PIPING PENETRATIONS: <br />ALL PENETRATIONS OF THE SUMP TO BE ON A LINE TOWARD THE CENTER 14. <br />- RISER GROUNDING: RISER GROUNDING: ALL RISERS IN <br />THE FILL SUMP AND THE ANNULAR <br />("ENVIRON"). ELECTRICAL PENETRATIONS SHALL <br />BE MADE <br />OF THE SUMP TO ENSURE <br />THE PROPER INSTALLATION OF ALL BULKHEAD AND COMPRESSION FITTINGS 9' - TANK STABILITY: TANK STABILITY SHALL BE CHECKED AGAINST FLOATATION, <br />SPACE RISER SHALL BE GROUNDED AND BONDED PER <br />DETAIL_ #4 ON DWG. TK4-2. <br />WITH APPROPRIATE WATER TIGHT COMPRESSION <br />FITTINGS WITH SEAL -OFFS. <br />AND RESULTANT WATER <br />TIGHTNESS, ALL PIPING, CONDUIT AND GROUNDS THAT PENETRATE 10. - DROP TUBE CRITICAL DIMENSION: THIS DIMENSION IS CRITICAL AND MUST BE ADHERED TO. 15. <br />- ANNULAR SPACE LOCATION: FOR A 10,000 GALLON 8' <br />DIAMETER TANK, THE ANNULAR <br />(I. E. ENVIRON), <br />THE SUMP SIDE WALLS <br />MUST BE SEALED IN SUMPS. SUMPS SHALL BE HYDROSTATICALLY CONTRACTOR WILL BE REQUIRED TO REINSTALL AT OWN EXPENSE OR WILL BE BACK CHARGED <br />SPACE RISER IS LOCATED ON THE FILL SIDE AS SHOWN. <br />2. - SIPHON PIPING: <br />TESTED WITH STANDING <br />WATER FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS FOR EXPENSE TO CORRECT INCONSISTENCIES. <br />THE HEIGHT OF PENETRATIONS INTO SUMP FOR <br />SIPHON PIPING VARY BETWEEN TANKS. <br />ARE WATERTIGHT. THE <br />OWNER'S ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK 11. - METHANOL COMPATIBILITY: FOR ALL METHANOL COMPATIBLE STORAGE SYSTEMS, ALL READILY <br />SEE DETAILS #6, #7 & #8 ON DWG. TK3-2 FOR TANK SIPHON PIPING DETAILS. <br />INSTALLATION CHECK LIST <br />i6 <br />BEFORE CONTRACTOR WILL BE PAID, ACCESSIBLE COMPONENTS WHICH ARE NOT METHANOL COMPATIBLE FOR THE IMMEDIATE <br />- TOP OF TANK ELEVATION: TO CALCULATE TOP OF TANK <br />ELEVATION. START WITH 18" MINIMUM <br />3. - ): SHALL BE UNDERWRITERS <br />6. - FILL AND VAPOR CAP <br />HEIGHT TO GRADE: THIS DIMENSION IS CRITICAL AND MUST BE ADHERED TO. INTENDED SERVICE SHALL BE RETROFITTED INTO THE STORAGE SYSTEM. <br />DEPTH OF VAPOR RECOVERY LINE AT THE FARTHEST DISPENSER AND SLOPE 1/4" PER FOOT <br />LABORATORY <br />APPROVED CALLED FOR ON THE <br />CONTRACTOR WILL BE <br />REQUIRED TO REINSTALL AT OWN EXPENSE OR WILL BE BACK CHARGED FOR <br />MAXIMUM TO 1/16" PER FOOT MINIMUM. ADD 12' AT <br />THE TANK, ADD 13" (FOR 3" PIPE) <br />>w :n <br />� d% <br />SITE S <br />SITE SPECIFIC DRAWING OR AS DESIGNATED ON <br />SHALL DOUBLE <br />THE SUPPLEMENTAL CONDITIONS AND <br />ME <br />EXPENSE TO CORRECT <br />INCONSISTENCIES. 12. - MANHOLE CROWNS: ALL MANHOLE OPENINGS ON THE TANK SLAB SHALL BE INSTALLED WITH <br />OR 8" (FOR 2") FOR A CHANGE IN PIPING DIRECTION OTHER THAN 90' OR 45', SET TAMS 6" <br />O <br />�••+ p7 r <br />WALL TANKS OF FIBERGLASS <br />REINFORCED PLASTIC (FRP) AS <br />A 1-1/2" CROWN OF CONCRETE TO PREVENT WATER INTRUSION INTO THE MANHOLE. <br />DEEPER THAN CALCULATED AS PRECAUTION. IN NO EVENT <br />SHALL THE TANK BE BURIED LESS <br />1... CL ..... .� <br />CT <br />MANUFACTURED BY MODERN WELDING. INSTALLATION <br />OF TANKS AND PIPING <br />7. - TURBINE SUMP SENSOR: <br />SEE SHEET TK4-2, DETAIL #i FOR LIQUID SENSOR DETAILS. SENSOR TO ON DWG. TK THE OWNER'S ENGINEER WILL BE REQUIRED TO <br />THAN 4'-0" BELOW FINISHED GRADE OR DEEPER THAN <br />7'-0" BELOW FINISHED GRADE. SEE <br />E L CO <br />SHALL BE IN ACCORDANCE WITH SPECIFICATION <br />73800 LATEST EDITION AS PROVIDED <br />BE MOUNTED AT SIDE <br />SEE SECTION A SIGN <br />OF TANK WHERE PRODUCT PENETRATION INTO SUMP IS MADE AND BELOW TANK <br />OFF ON THIS ITEM ON THE TANK INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE PAID. <br />MANUFACTURERS INSTALLATION RECOMMENDATIONS. ANY <br />VARIATIONS IN SLOPE FROM 1 4 <br />/ <br />O 0 Lo <br />U N <br />BY ARCO PETROLEUM PRODUCTS COMPANY, AND <br />MANUFACTURER'S INSTRUCTIONS, <br />LOWEST PENETRATION <br />FITTING WITHIN SUMP AREA. <br />PER FOOT SHALL BE REPORTED TO OWNER'S ENGINEER. <br />p��••� <br />0 U � •0 <br />FUTURE GAUGE <br />-4, <br />TK3-1 <br />FUTURE GAUGE <br />LOCATION <br />8 8 <br />/ <br />- REF REFr <br />21 PRODUCT INACTIVE SIPHON <br />SLOPE AS SHOWN ON <br />20 DETAIL #10 ON DWO. T13-2. <br />c W <br />M <br />�• <br />4" PIPE PLUG <br />'^ 6 41 <br />>� <br />h <br />4'_+ <br />f/ <br />W <br />+ <br />O a <br />10 W <br />o, <br />SEE DETAIL #5 ON DWG TK3 1 <br />12 2" V.R. FROM HEADER <br />FOR COAXIAL FILL ARRANGEMENT / _ 12 70 2t <br />2" PIPE PLUG IN <br />> Co <br />O,K <br />a' <br />(FOR WASHINGTON AND OREGON ONLY) REF REF 4'X2" <br />SEE NOTE 22 <br />•.�,I <br />z w <br />j <br />#1 IIS 22 1 DOUBLE TAPPED BUSHIN;; <br />zj <br />ryry O •-- <br />o.,� <br />II (TYPICAL W/ INACTIVE SIPHON) <br />n <br />4"X 3" VAPOR RECOVERY ADAPTOR 2" PIPE CAP <br />s z <br />& CAP IN SPILL CONTAINMENT 24 - <br />NEW 2' UNION r HAND TIGHT ONLY <br />FILL BOX, j ; (TYPICAL W/INACTIVE SIPHON) <br />L. <br />C0 <br />ry <br />i -- <br />SCR'D BLACKSTEELCq <br />,t�- <br />I <br />13 <br />20 <br />cd <br />7 5� (° 11 END TANK CONNECTION FOR <br />ALL MANHOLE ACCESS COVERS <br />SIPHON <br />12 <br />TO BELOW GRADE SHALL BE ++''s 22 SYSTEM SHOWN HERE. SEE <br />'-•°f." <br />DETAILS <br />4" FILL ADAPTOR — <br />#6 & #7 ON DWG. TK3-2. <br />LIQUID TIGHT AND LOCKABLE + <br />SEE NOTE #10 <br />& CAP IN SPILL <br />,•� FOR S TANKSIPHON <br />N2NEC110N <br />--• <br />CONTAINMENT FIE DOX <br />NEW 2" UNION SEE DETAIL #8 ON DWG.TK3 <br />SCRb BLACKSI6TEEL �� <br />'U� - <br />-1� <br />2" F.G. VENT <br />PIQI View <br />TK2-.1 <br />1 <br />H <br />Td2-1 <br />Q„ <br />1-1/2"x3/4" GALV. <br />REDUCING <br />NOT 10 SCALE: 6 <br />TK3-1 <br />TEE W/ 1--1/2" GALV. PLUG <br />ca <br />14 <br />15 16 <br />8 9 <br />4 <br />4" PVC THREADED <br />J <br />PIPE CAP <br />CABLE GRIP <br />12 <br />E #6 <br />- (-1 /2" MIN. CROWN-- /-( 18 32" D / <br />/ 18". - TAT 6" MIN. 17_ <br />(TYP. TYP,) (TYP) SE <br />r -H CGB 293 TYP <br />( <br />)-- _ <br />/ To <br />TIP. ALL OPENINGS) 12 MAX <br />SEE NOTE #ice <br />A C PAVING <br />« •, <br />:. <br />1I <br />.. • ' • " <br />...VVVunn!!!' <br />• <br />r _•...., <br />ca <br />. • <br />- rL.° <br />• <br />23 3/4" COND. TO TURBINE <br />SEE NOTE . <br />SEAL OFF <br />_.: <br />- - <br />�( 23) SEE NOTE #1 3/4'CONDUIT .- � \ (SEE NOTE #13) <br />(SEE NOTE #13) J -BOX T Q L..,.r; SEE NOTES #4 & #5 <br />.� <br />,. <br />5 GALLON SPILL <br />3/4 COND. CONTAINER W/ <br />LOOP TO SUMP I � <br />NLINE DRAIN <br />SEE NOTE 13 <br />( # ) <br />-�_- iJ�r'�aa: <br />+ s- <br />, <br />`, =�3/4" CONDUIT (SEE NOTE #13) SEAL OFFS, � ,�-'_•-- 13 � <br />11 20 <br />SEAL OFF 4" x 24' L BLACKSTEEL f <br />IPI G <br />RISER W/ PIPE CAP I� ---- ° _ SIPHON PIPING <br />,-. <br />n <br />Q <br />•�_� '�� <br />1-1/2" GALV. <br />-- <br />23 ��. <br />SEE NOTE #2 <br />P�XFEMALE <br />��r <br />� ••-• <br />/ <br />RISER PRIMED <br />i EMT FITT NG 1 2' FEMALE EMT FITTING' 10' <br />/ / 1 21 <br />,. <br />`• <br />•�CL <br />AND WRAPPED <br />2 <br />TO GRADE <br />( <br />TURBINE CONTAINMENT SUMP (FURNISHED I 1 F '_ _ 2" VENT & VAPORS 4 <br />o <br />i <br />- --- <br />L.J <br />BY TANK MANE) FIELD BOND TO TANK _ <br />3 COLLAR. SEE DETAIL #1 ON DWG. TK3-1 / - .. 2' BELL & FNPT o >. <br />ADAPTORi <br />� <br />tV Qf <br />++ <br />3/4" CONDUIT <br />23 <br />_ <br />FOR CURRENT STANDARD I �I <br />M1 <br />LOOP BETWEEN <br />TANKS FOR <br />FUTURE GAUGING <br />(W/ PULL <br />(j _.— <br />,. <br />4" <br />__ _ <br />=:,f i _ .. r _ <br />i' 7 <br />__ �/ <br />_. --._. __ -. ---- - \ \ <br />\ ___ <br />1 1 <br />4 <br />.y C <br />p• ® N �. <br />•� <br />STRING) <br />BLACKSTFEL <br />'i <br />22 <br />y�••�� <br />L.d. •I -E <br />(SEE NOTE #13) <br />RISER <br />SUMP MONITOR SUMP MONITOR <br />(LIQUID PROBE) 18 18 (LIQUID PROBE) SEE- <br />w. -__.__._.__...•• <br />NOTE: SECOND INSPECTION <br />(� •� <br />17 <br />SEE NOTE #7 SEE NOTE #7 NOTE #1 <br />WELL NOT SHOWN <br />THIS VIEW <br />y'• C `-- <br />j I j <br />j <br />j' j I � j BACKFILL <br />PEAGRAVEL/ <br />4 •• 0 e - <br />I I I ,I <br />•�� 0 y- <br />I I I I CRUSHED ROC;( <br />\ <br />AS PER TANK <br />,n <br />MANE. SPECS. <br />w <br />■•!t•qj U (� 4F - <br />l <br />5 7 Ij (TYP.) <br />pVV•�// U) '. <br />�/ <br />I 'I <br />a <br />L1 <br />r- <br />SEE NOTE #3 <br />BALL CHECK VALVE <br />I III <br />4Z 0 1 <br />j <br />41 <br />- <br />I <br />00 <br />0) 4h� /y 0 <br />I I <br />I <br />V / <br />U. <br />Q <br />I I <br />w <br />LLI vJ y.... <br />Q� <br />= <br />Q <br />IL- <br />C)/ <br />z <br />3 <br />0 <br />TANK LEAK— <br />19 DETECTORio <br />1 <br />45 <br />1/4" STEEL PROTECTION <br />PLATE-TYP. ALL <br />N <br />z <br />M - <br />.,Y _ <br />( LIQUID <br />O <br />a <br />PROBE <br />! <br />\ SSTEELOPENINGS TANK <br />-_ <br />V' 2 <br />SEE NOTE 7 <br />-- -. _. <br />-=D,` ---- '. -' -'-_ --- "'\ <br />--_ _.. _ \ -_-_ <br />b{. UALW�hN Fl <br />II <br />G( J-/ <br />�.v <br />-------------------------------------------------------------------------------- <br />____ .___ <br />.--------------------------------__-_...__. __-__-___ <br />NG1N� <br />2 BLACK � <br />�I PEAGRAVEL CRUSHED <br />'J <br />s m 1Pn°�'`" <br />uovvmm <br />" o OEIcx sPEcu�sTs' <br />18215 72ND AVENUE SOUTH <br />KENT, WASHINGTON 98032 <br />.. <br />TANK SHALL BE SFT DEAD LEVEL OR SLOPED 1" MAXIMUM FROM LEVEL TOWARD ANNULAR SPACE MONITOR STEEL_ PIPE <br />�- <br />- ROCK BED/ <br />�G <br />(425) 251--6222 <br />J <br />w <br />_ <br />�AF1G �' <br />Ati <br />\ <br />\ <br />rs <br />�{ <br />BCE 4009 <br />O <br />2- <br />- - <br />/---"_"'- <br />...- <br />TANK SIZE VARIES WITH MANUFACTURER AND MODEL NUMBER 2'-C <br />- <br />N.T.S. <br />_ -- -. --I. <br />/ <br />'I N.T.S. <br />(,'}U <br />1/15/98 <br />EXCAVATION <br />END OF TANI(.-� EXCAVATION <br />- I'°? <br />, R " <br />w <br />O <br />ONLY <br />ONLY <br />Q <br />Q <br />THIS DESIGN ARRANGEMENT IS TYPICAL FOR DOUBLE WALL STEEL_ <br />1/30/98 SILK <br />TANKS. SEE SITE PIPING PLAN AND TANK FITTING ORIENTATION <br />3/4/99 ADDED NEW 10,000 GALLON <br />MODERN WELDING>�:_ <br />3/5/99 <br />:2P <br />ABOVE FOR ACTUAL MANUFACTURER'S CHOSEN FOR THIS PROJECT <br />TANK PER ARCO FIELD ENGINEER <br />LI AY <br />O <br />z <br />Of <br />Underground Tank Section <br />3/5/99 <br />2133 <br />w <br />O <br />NOT TO SCALE: <br />TK1-2 <br />w <br />z <br />SEE NOTE #3 <br />',. <br />I I ._ rJU9\MEf_'HAIIIfAL\iAfJP°5Vo0U9Jk 12.GWG bate/N,, 03/0` 1,L- _ .:a1 . 1_1.. ., <br />