Laserfiche WebLink
I <br />2. <br />SECONDARY PIPE SYSTEMS (CONTAINMENT) <br />Shell's approved spill-contomlenl fill box is o very <br />C. Free or organic material, ;can, trash, snow or ice. <br />XV-6 FINAL ITEMS <br />_ <br />unique concept with a vopor & water tight seared inner lid. <br />In freezing weather must be kept dry. <br />NI containment hardware (Including clamps, seas, gaskets, <br />This fillbox is a complete assembly Which includes an 18" <br />1. Tanks to be gouged for product level and water. My <br />flexible boots, tic) ore "contractor furnish oral 'rntar <br />diameter slob occev box with on 18" diameter structural <br />Sand is not o sell-competing material and will have to <br />measurable arrant of water will be removed horn to system. <br />items. M such hardware is available though local <br />fiberglass lid. See to Approved Materials Lists lar <br />be mechonicdFy compacted in layers of 12" or less b <br />distributors. Sec Approved Maleras Lists Fa opprored <br />supplitr details, <br />achieve a mirimum 90% Standard Proctor Density Wougcoul, <br />2. All product piping is to be bled corthlty for or os <br />suppliers. <br />- <br />Use a mechohicd plate-type vibrator (2000-3000 vibrations/ <br />submerged pumps at tested. System is to be tested lar <br />the MANDATORY absorbent sausage is NOT furnished by the <br />minute). Do not use a concrete vibrator or water lmpig• <br />tightness and proper operation of kok all or <br />NI conLawert hardware is to be slipped aver primary <br />abort noted fifbox manufacturer. It must be purchased <br />pressure seraors ad impact ropes after Ines ace bled. <br />piping and left loose while Drirnory piping is japed. <br />separately by the contractor. These absorbent socks are 3" <br />Where surd is used to bmkfll the trenches, filter fabric <br />Aller dl segmons d primary, piping have been pressure <br />b 4" in diameter by 48" long, are hydophobic (.ift not <br />barriers ore required between IN trending and the lank <br />3. Aller calibration check of tach dispenser• stroiners will <br />tested (50 psiq m'rini with scop for I fear), secondary <br />obsab water), and oleophific (win of petrdeu , <br />We bockfill malerid. <br />De remawd and cleared, taking core to catch any product <br />cantonment hvdware may be honed and wrilory pressure <br />products and any chemical cool bonded to the petroleum <br />released white removing fillers orW/a stianer elements. <br />tested (3 to 5 psig MAXIMUM with soap ar I hour). <br />molecule. Preferred suppliers we. <br />4 <br />STORAGE AND WOLING OF BED/BACKFILL MATERIAL ON S11E <br />t. Check Rae vide of can nozzle to issue pumping copeity <br />Stories rsN warm clamps must De lightened in two <br />WOLF "pl Onty" 1-800-227-WOLF <br />Do viol allow bed/backfill material to intermix with an <br />is adequate %carding to monlacluen's recanmendoDon. <br />seporcle posses. First pass, lighten to 35 to 40 inch- <br />MATASORB "M-30" 1-800-222-4799 <br />excavated sol or other material on site. Conlarninotion <br />pounds torque. Second pose, Dghten to 60 inoh-ponds <br />OCLANSORB "Sap-Sox" 1-403-290-6650 <br />of sell-competing gravels could result in to need far <br />5. Test to operation of dl leak detectors oral impact check <br />lorgw. NEVER tighten ckmpe horn 0 to 60 inch-pounds in o <br />mechanical compaction. The mirimum/maximun particle <br />valves in accordance with annual leak detector/Ane lest <br />single pass or minor joint teals may result <br />Stage I vapor risers NO util o standard 12" diameter <br />sizes specified we critical far self-canpoi <br />procedure. <br />slab access box with o 12" by 4" Fil-Seol-Pok nitrile Ii er <br />Containment hordwor4 must be connected in mcadonce with <br />from American Liquid Controls (phare 1-313-646-3732). <br />In freezing conditions materials must be kept dry and free <br />6. The contractor to provide o red fined "as built" copy of <br />morvfoctrx's instructions. As with dnteMR %trgim <br />of ice. <br />site plan showing %tool location d dl piping runs and <br />pipe brands, do not mix brads of contoimenl hardware. <br />Submerged turbines ore furnished by Shen and are to be <br />orientation d dl for* appurtenances. <br />ordered for 92" doblewall fiberglass tanks with o manwoy <br />Do not intermix gravel, stone v gravel crushings, a sand <br />Both suppliers 61 contarnsert piping can furnish 6" <br />ad with a maximum 12" mounting riser. The turbines are <br />in the some excavation or connected excavation without <br />7. A completed "Ins(dbban Inspection Procedure & Checklist' <br />dioniler bank riser conlorvtenl pipes (either TEE version <br />inetdkd inside a 48" fiberglass sump furnished by Shelf <br />filter fabric barriers (see paragraph 5 covering use of <br />with the accompanying 'Certficde of Test" is to be <br />or non-TEE version). Thee riser coniaiwnent pipes have a <br />with the for* and cane 0adard with a friction-fit lid. A <br />said stabilization and filter fobric to prevent migration <br />provided the Shell Engineer lar approval on completion of <br />I" Wended pat for senor cond,l <br />special pressure-tot lid is avoifal by special order at <br />between dss,milr sails). <br />tx iras(Auton. <br />Unites required by bad codas or spetiAed by the SWIoddtionol <br />cost <br />5. <br />INSTALLATION OF SOIL STABILIZATION/FILTER FABRIC <br />, <br />engrseif, of tank risers except turbine sump toll NOT be <br />The sump height can be field adjusted by trimming the <br />monitored by a senior as troy should never (ar very <br />bottom edge of the sump barrel, NOT to edge of the color <br />At pipe trenches MUST be lined with on approved soil <br />Infrequently) canbm any fqd Irukoeabon drawrgs <br />(which is foclory-tioded to to tank). For increosed <br />stabilization filter fabric, regardless of sal condition <br />show detals lar such sereas when necessary. CONTRACTOR <br />depths. two barrel section may be staked. <br />and type of backfill material used. Approved fabric <br />WILL ALWAYS INSTALL CONDIAT AND ACCESS BOXES EVEN WHEN <br />materials are the some as specified in section XIV-9. <br />SENSORS ARE NOT INSTALLED. <br />N penetrations and cuts an Nese sump barrels should be <br />accomplished with carbide or carboruncl hole wws and <br />Material should be cul to an appropriate width for to <br />3. <br />FLEXIBLE CCNNECTORS/SWING JOINTS <br />bodes. Ordinary cutting tools will not survive the <br />depth and widm'of to pipe trench so that tore is <br />cutting process. <br />sufficient material to overlay to top edges of to trench <br />FOlern�bte torreclon ore b De irslded d Nallow"The <br />owing pipe installation and make a complete "elope d <br />stop barrel joints may be seated in to Wal <br />the bockfilf at subgrode os flown on drwnq AR-78022 with <br />dfec6ig the U.L. Lobel by ordering Ne sump bonding kit <br />a minimum, d 6" op at the bp. Laps of material dog to <br />A Between submerged pumps and %wools product lines. <br />from to lank manufacturer. Minor koks oroend Uniseols <br />trench excavation should be o minimun of 2 feet <br />can be sealed with either Bostick's Chemcaulk 1000 Urethane <br />B. N %Aside tarsen of star A vapor manifold <br />sealoht or DAP 100. Silicorited Rubber Sealant (concrete <br />6. <br />BEDDING OF PIPE <br />sealant). Both ore compatible with gmd;m and dcord. <br />C. Under each disperser between containment pans and <br />The latter sealant is cNol le in ypkd hardware stores. <br />A minimum 6" dee compacted bed, ailed b the r <br />D P gr give Doper <br />fibergfoa pipe rod br either gowire or ridge If <br />slope or depth of pipe runs, must be lad in trench before <br />vapor, aro mq be required <br />The normal kala lest for o turbine containment sump will be <br />pipe runs ore installed. Pipe run should be fobrkaled <br />a Iytrosbtic test with water. However, a ceded-joint <br />at groat and installed property spaced on the completed <br />D. Underground d bass of vont rims <br />sump with pressure-tight lid may be pressure tested to o <br />bed. Mer making necessary connections of rom brochenl <br />MAXIMUM 3 psiq AFTER THE CONCRETE SUB HAS BEEN POURED <br />or filb'ngs which must be made up in to teak, bed <br />E. N piping correction to wash d d Fad at Mas. <br />AND CURED. weight of els slab is MANDATORY la sale <br />malerid should be placed back oder IM piping and <br />pressure testing. <br />g. <br />Drapery carpeted <br />Swing jdrM d 9alvonzed hardware are ONLY permissible in <br />or 4" galvanized pipe runs (4: renal I% atage d s <br />Contractor s vide responsible to proproper clearances <br />7. <br />TESTING AND INSPECTION <br />I vapor correctors) ad ONLY whore them on applicable <br />between M lrbre stop, AAbowes, ek and M bio <br />AR-series imkllotion drodrvje, <br />rims per q+plicoble inelafbtion drowirgs. Pump and fid <br />After oll tines have been installed, and before tel' at <br />box maJcles od/or connecting piping must be elf <br />backfilled, links are to be disconnected from the lake, <br />A pipe swing ' shat be composed d two ell (or <br />ng and not coklode <br />sgportd pr mn-lood the . <br />Plugged a copped. subjected to a minimum 50 pi gage air <br />simior filtlivrar4 o pips ripple. Typical approved <br />presue (or as required by local or state cafes) and <br />"soapy" <br />short ripples, which wig allot M wed a pipe wrench on <br />6. TRENCHING AND PIPE OWSES <br />checked for leaks with o solution in the Dreenct <br />Ne body of the ripple bebreen two fil1inp would be as <br />of to Omnil representative for a minimum of 30 m+sAm <br />follows: <br />Trenching width must be sufficient to maintain to proper <br />Gouges far this test should be 0-100 pi range• <br />clearcri between pipes and side wdls as shown on <br />drowings AR-78022 and AR-78025 and of a depth sufficient to <br />Air testing of Mergloss piping is not a recommended <br />PIPE <br />NIPPLE <br />INSTALLED <br />provide to proper bed/can/piles of Goes per dowing <br />practice by piping monudacturers unless cyton safety <br />SIZE <br />LENGTH <br />LENGTHS <br />AR-78024. Note that the mnmum cover b finish grocle over <br />precoub'ons ore fabvred. Contractors should obtain <br />(n) <br />(n) <br />(n) <br />product lines outside to concrete islad mat area is <br />appropriate procedures from 6bergoss pipe eWDlitirs and <br />18 inches, <br />assure respprmbilily lar allowing sane for prescribed <br />1/2 <br />2 <br />1 <br />testing presues. lheir recommendations wit include <br />3/4 <br />2 <br />7/8 <br />Pipe choir is the concrete or OVWI paving shot be <br />cover" pipe between joints, placing sand bogs a. atter <br />1 <br />2 <br />1-1/8 <br />constructed as detailed an the drawings and as located an <br />resUdnts ot intervals and orw nerosolety precautions fa <br />1-t/1 <br />2-1/2 <br />1-1/2 <br />to plot plan. The minimun spacing between adjacent pipes <br />personnel waking an site and/orinvolved in to test or <br />2 <br />3 <br />1-1 2 <br />is S", however piping nus Nil viol be layered. Where <br />inspection. <br />3 <br />3-1/2 <br />1-1/2 <br />piping fors must cross, a 5" verDcd dimension between <br />4 <br />4 <br />1-3/4 <br />pipes should also be mointoned. The exception to this <br />Prior to making to No pieswe lest in to presence of <br />rale is where o brach lira to a dispenser crises adjacent <br />the Owner's representative, it is recommended hat to <br />product lines with a !roe and 45 degree elbow as detailed an <br />contractor first apply o low Pressure 5 ps1 kale test b _. <br />Where correctors ore completely, contained (it: nal n <br />drawing AR-88171. <br />insure that all adapters are securely treaded nb place. <br />aortal with grand ruler, name sal, or Eock6n <br />that cohesive has been applied to every jalnl and property <br />mabrid), sbrdad ibirkse sleet cornwil wits as <br />All open benches shall be properly barricaded and <br />cured The low pressure led test can be applied in a <br />ewive&g sed fitting we quite mcepbzl <br />desigrol to insure public safety. No trench whet be <br />shat.. Done, tis, immedbtey locating any, body mode <br />Nft open and unmarked overnight <br />be aspected <br />joints. .if linleakage Y be carefully <br />Where carseclors are nal carr,pfeto contained, ONLY one- <br />asci <br />evidenced led b n la <br />o illy solution an is joints. <br />corrosion or non-ms9dYc comecbre uilh ace ewivir" trial <br />Product piping and stage A vapor piping nowt terminate at <br />fittings, and pipe wills. Once it hos been determined that <br />filling may be Load Seo to Approved Materials Lsts for <br />containment pas oder M disperxms. Ther pas must not <br />M Ani is ell to U test pressure should be applied <br />acceptable hardware. <br />drain into or trough underground piping or trough to <br />and dbwed to remain as Iona as specified. <br />piping containment. Any 6grid trapped within the Dau <br />NOTE: Si gle-plw severing MPT end AWN* u®t two <br />must be revved maiadfy and property disposed. See <br />Aster recomectiah of all Imes and prior to backfilling <br />gasall oral dcdma compatible C-rings, that sed <br />Approved Materials Lists lor dotal& <br />d sane, to tMire system, to include loris and of <br />lignter w pressure icreasi 0-rings are not used. <br />lines, is to be subjected to a find dr test d 5 prig <br />XV-5 BEDDNG/BACKFILL MATERIALS AND PROCEDURES <br />lar a mirimuns d one sou witnut o meouable, km d <br />4. <br />VENT AND VAPOR PIPING - SLOPE OF LINES <br />Pressure. cages lar this test should be 0-15 psi rage. <br />I. (RAVEL - STANDARD <br />A nvrimrrmm *0d 1/8" pee Wal is regaled kr d <br />The contractor we provide to owner's representative <br />undergrosnd v'44 ad vol piping. Novara, to maximus <br />Stallard bed and bockfill material shah be naturally <br />with a certificate of letting and inspection indicating <br />available elope daaAd be used within regifefremts far <br />rounded oggir". cleat and free dowinngg with particle <br />that the piping ord Complete system hot been tested in <br />cover over pipng and depth d talks. Pipe cover <br />in not less tlhorm 1/8"amore tlmorm 3/4" n dameter, <br />accordance with test specifications and las been ford b <br />be tight and in compliance with dl state and food coda <br />?,UI I W (3ENJAMIN NiiLT <br />- UFIVE INTERSTATE. 5 <br />requirements ors detailed on drwirgt AR-78022 & AR-78024. <br />Use this description when specifyrig a ordering became <br />motel is known by different ortoe This material is <br />covering such an installation. <br />9TC:C:K'T()N, C1\L.IfURI\JI,tx, <br />Piping wit be kMakd an pus-grodtd compacted bed <br />commary, coW pea gravel. This is to sane mated m <br />8. <br />BAgNFILLING OF PIPWC <br />maWid. No suppari or cpocirg nw9evid a4w than to <br />slift6i far the tank installation ad is classified as a <br />bed and bakAe ml be kA n aortal with tse pip <br />self-carpocting material. <br />Ater satsfmtay completion d all required testing and <br />— <br />M "tract d irrelakill should prevent the <br />d any ser or Jxrnps wtich would trop to Ares and which <br />2. ALTERNATE - STONE OR GRAVEL CRISHINGS <br />inspection of primary and secondary piping, backfilling of <br />vel not be penndsedto <br />trenches to subgrode elevation should be completed as <br />MARK <br />DATE REVISIONS <br />BY , <br />Stare or grovel austings with angular particle size not <br />required fa to material used. <br />M uaontdned 2"/3" fibrgoss stoge A vopar maifold s <br />less ton 1/8" or more ton 1/2" in diameter• washed and <br />I1 it becomes nese dui the course d cantructias <br />nary n9 <br />required to nWcarect bales at Uro turbine end d said <br />Mae. This configuration is GARB opprartd. Ste AR-88162. <br />free flowing is acceptable as an alternate material. This <br />material must meet ASTM C-33 paragraph 9.1 requirements <br />b switch tan to standard backfin materia b an <br />SHELL OIL C OMPAN) <br />Actual pipirg corvW5cxt b tris n-euDari A <br />t ull aot <br />dir s 'of classified o <br />via offal and sonads w <br />allefrate such OS sand, soil ssobiizoton ohd (iter <br />lobrk runt be installed as a Darier between to two <br />Vas with no-bleed ripples. Theses valves are NOT la <br />ll <br />self-compocting mote al. <br />noncovpotible materials. Approval of to Shell engineer <br />HOUSTON, TEXAS <br />overfill protection; they arty provide added insurance <br />against cross-drop product cmbr inatia1 <br />3. ALTERNATE - SAND <br />must be obtained before making such a substitution. <br />5. <br />TANK FITTINGS, MAMIli AND APPURIENIANCES <br />Sad must be clean, washed, inert wtA graduated and have <br />GENERAL. SPECIFICATIONS <br />Ne following chaocleri3kv <br />Al fills (Includingremotes) are to incorporate un <br />oulrriak isbtl FA Dbe (see Approved Materials Liss <br />A Less tim 8s by weight passing J200 sieve. Such <br />... .. <br />— <br />RETAIL FACILITIES <br />fa acceptable hordwore). Said ebts art to be Ranged <br />fives mart be noplosbc, <br />under the truck hose correction conn. The tbes cane os <br />V <br />SHEET l <br />J,and require field ossemby before isldatias <br />B. 1/8" dia'neter a Itis particle size. <br />Remember to drill 0 3/16" pressure squcAzoticr hole <br />Waugh to blot just below to top of krk per AR-88174. <br />crAi F unser <br />APpfl RY: <br />a <br />