Laserfiche WebLink
XVI <br />FINISHED GRADING AND LANDSCAPING <br />XVIII CLEAN UP AND FINAL PAYMENT <br />(By General Contractor) <br />(By General Contractor) <br />Upon completion, all unpaved and disturbed areas are to be <br />finish graded; sodded and/or seeded; and landscaped <br />Crushed aggregate base course will be spread on the prepared <br />Upon completion of this job, General Contractor and Fabricator <br />as shown on <br />Plot Pion, Grade Plan or Landscaping Plan. Refer to Addenda to <br />subgrade to such depth that when thoroughly compacted it will <br />will immediately remove from the site all debris, rubbish, <br />Speciliotions to determine whether landscaping is included in <br />conform to the grades and dimensions shown on the plans. When <br />construction equip ment, etc., which was a direct result of the <br />this contract, All landscaping will be performed in accordance <br />the required compacted thickness is 6'. it may be spread in <br />General Contractor or the Fabricator's work, and leave the <br />with Shell's Landscaping Guide. Areas to be seeded, sodded or <br />one course. Where the required thickness is more than 6", the <br />premises in a condition satisfactory to the Owner's <br />landscaped are to be graded as indicated in Section-IV of these <br />base will be constructed in two or more courses, the maximum <br />Representative. <br />specifications. <br />thickness of any one course will not exceed 6". The material <br />will be spread by bloding with a heavy blade . grader. In areas <br />XVIII-1 WINDOWS & STOREFRONT <br />XVI-1 <br />SEEDING <br />inaccessible to the grader, hand spreading' or other means <br />(By Genernl Contractor or Fabricator) <br />acceptable to owner's representative will be . employed. <br />Areas to be seeded will be shaped, seeded, rolled, fertilized, <br />Clean and wash oil windows, <br />covered with straw and watered. The applicable Slate Highway <br />Each base course will be watered to approximate optimum mois <br />XVIII-2 FLOORS <br />specifications for filled slopes will apply. Just prior to <br />lure content, bladed to proper cross section and thoroughly <br />B General Contractor Fabricator <br />(Y ) <br />placing seed, commercial fertilizer of 6/12/12 grade will be <br />rolled. The finished base will be within 1/2" of grade, will <br />or <br />uniformly spread over the top soil at the rote of 50 pounds per <br />be firm and unyielding, and will sustain a moving, loaded truck <br />Thoroughly clean all floors and seal all concrete floors in <br />1,000 square feet. Water as required for a minimum period of <br />without showing wheel marks of more then 1/4" or movement of <br />accordance with these specifications. <br />three weeks to insure seed germination and establish growth. <br />aggregate particles. The relative density of each course, <br />after compaction, will be not less than 90-percent using the <br />XVIII-3 _EQVjPMENT <br />XVI-2 <br />SODDING <br />ASTM-01557 Method C or D procedure. <br />All equipment installed by the Contractor or his subcontractors <br />Sod will be a solid cover of living grass. Sod to be cut <br />XVII-5 ASPHALT CONCRETE MATERIALS <br />will be tested and left in satisfactory working order. Equip <br />approximately 1-1/2-inches thick and be free of weeds and <br />ment installed by Fabricator will be tested by Fabricator per <br />stones, Just prior to placing sod over the topsoil at the <br />The asphalt base and surface courses will be in accordance with <br />State Product Approval, local building and health code <br />rote of 50-pounds per 1000 square feet, Sod will be placed <br />the standard specifications of the Stale Highway Department of <br />requirements, <br />smoothly, edge to edge, with staggered joints and then tamped <br />the State in which the work is to be performed. The Stale <br />or rolled to eliminate air pockets. On slopes of 2 to 1 or o <br />specifications to use will be the ones that most nearly meet <br />XVIII-4 CORNER MARKERS <br />greater, sod will be fastened in place with wood pegs, or other <br />type Ille for base end type Vo for wearing" course as specified <br />approved method. Sod will be thoroughly watered immediately <br />by the Asphalt Institute in the current issue of their <br />The General Contractor must preserve all property corner <br />otter placement and additional waterings made doily for a <br />"Construction Specifications For Asphalt Concrete and Other <br />markers and upon completion of work, he will have set at each <br />minimum of ten days. Sod that is damaged by storage or plot <br />Plant-Mix Types'. <br />corner either a pre-cost or cost in place concrete monument <br />ing will be rejected and immediately replaced by General <br />with o permanently set bronze disc. <br />Contractor. <br />Asphalt concrete will be produced by a commercial asphalt <br />paving plant. Mineral aggregate and asphalt concrete produc <br />XVII-5 AS INSTALLED DRAWING <br />XVII <br />PAVIN <br />tion will conform to the local prevailing State Highway <br />(By General Contractor) <br />Standard Specifications. <br />Upon completion of the work, the General Contractor will submit <br />to the Owner's Representative a marked copy of the General <br />XVII-1 <br />GENERA <br />Paving asphalt will be on 60-70 or 85-100 penetration if 60-70 <br />Layout, showing thereon the exact location of all underground <br />is not available. Mixtures will be delivered to the site at <br />piping, conduit and utilities. Fabricator will submit to the <br />This section consists of the preparation of subgrade, base <br />a temperature of not less than 270x or more than 310xF. 'No <br />Owner's Representative a marked copy of all Slate Approved <br />course and wearing surface for the facility's driveways, <br />asphalt concrete will be constructed except when the base on <br />Permit drawings as delivered and installed at Shell futility, <br />approaches and parking areas as shown on plot pian and or grade <br />which the asphalt concrete is to be placed meets the quality <br />plan, Refer to Addenda to these specifications, plot plan <br />and compaction requirements described under Subgrode or <br />XVIII-6 FINAL INVOICE <br />and/or grade pion to determine if paving is to be asphaltic <br />Aggregate Base herein, <br />concrete or deep strength asphalt. An asphaltic concrete <br />The final invoice of the Contract will be accompanied by the <br />pavement will consist of subgrade, aggregate base course, and <br />XVII-6 PLACIN <br />following: <br />a two course bituminous concrete pavement having a total depth <br />after final compression of 2-1/2" (1-1/2" base and 1" surface). <br />Asphalt concrete will be placed by the use of a self propelled <br />XVIII-6-o. Certificate of Occupancy <br />A deep strength asphalt pavement (also known as full depth <br />asphalt paving machine, except where the inaccessibility of the <br />XVIII-6-b. Electrical Certificate to operate Shell facility <br />asphalt concrete) will consist of Subgrode, 4" (minimum) <br />work precludes their use. On such work, the asphalt concrete <br />XVIII-6-c. As installed drawing as heretofore mentioned in Item "F" <br />compacted hot mix bituminous base course, and 2" compacted hot <br />may be spread by means of a spreader box or by hand methods. <br />above <br />mix bituminous wearing course, I <br />XVIII-6-d Heating and Air-Conditioning Guarantee, checklist and <br />l efore any asphalt concrete is laid, a "tack coot" of asphalt <br />operating instructions (by onsite installation/stort-up <br />Paving contractor will work to established grades shown on plot <br />will be applied to the vertical faces of all curbs, gutters, <br />contractor) <br />and/or grade pian working from Bench Mark shown on survey. <br />and structures below the surface of the pavement. <br />XVIII-6-e. List of Subcontractors, current addresses with telephone <br />Finished elevation grade stakes and any other surveying neces <br />numbers, warrantees and work performed. <br />sory for the layout of the work is the responsibility of this <br />The asphalt concrete may be placed in courses or in thick <br />contractor. <br />lifts. If the paving is done with paving machines or spreader <br />XIX PAINTING <br />boxes, the mix may be placed in compacted lifts or not more <br />The paving contractor will make every effort to protect exist. <br />than 4-inches. Areas of asphalt concrete inaccessible to <br />Refer to Shell Pointers Guide for pointing specification. <br />ing installations. Any such installations which ore shown on <br />compaction by power rollers or abutting Portland cement <br />the plan or whose location could be reasonably inferred, and <br />concrete pavement will be compacted by the use of vibrating <br />which become damaged or broken by the paving contractor's <br />compactors or other mechanical means approved by the owner's <br />operations will be repaired or replaced by him. Core will be <br />representative. <br />taken at all tunes to protect curbs, buildings, and other <br />objects from being stained or spattered with asphalt. Any such <br />XVII-7 COMPACTING <br />stains resulting from the asphalt paving work will be removed <br />to the satisfaction of the purchaser's representative. <br />Compaction equipment used will be in accordance with the <br />following course thickness: <br />XVII-2 <br />5t U.GRRA E <br />1" or thinner, minimum 5-ton roller <br />The subgrade will be prepared and maintained in accordance with <br />1" to 2" thickness, minimum 8-ton roller <br />Section-IV of these specificotions. If any portion of the sub <br />2" to 3" thickness, minimum 10-ton roller <br />grade has been damaged during construction it will be replaced <br />3" to 4" thickness, minimum 12-ton roller <br />to the owner's satisfaction prior to placing the base course. <br />it is the responsibility of the General Contractor to secure <br />For pneumatic rollers used for initial (breakdown) or secondory <br />the proper inspection and written approval of the Owner's <br />rolling, 12 to 15 tons, with tires capable of 90-psi inflation <br />representative prior to proceeding with pavement of the finish <br />pressure. <br />drive surface. <br />The number of rollers on the project will be,sufficient to <br />9011 W. t ENSAMIN HOLT' pRNE PA LNiEKGVWE 5 <br />XVII-3 <br />AQ_ GREQATE BASE <br />accomplish satisfactory compaction in an,efficient .monner. <br />STOGKTUN, CALIF-OWNIA <br />When an asphaltic concrete pavement is tolled for in the <br />Initial rolling will commence longitudinally at the lower <br />Uwa <br />Addenda to Specifications, Plot Plan and/or Grade Plan, the <br />elevations such as flow lines, and proceed, parallel to suchaggregate <br />base course specifications for the Slate in which the <br />lines, toward the higher elevations. Rollers will not cross <br />au[ h[visitr !r rMvi <br />work is to be done, that most nearly fits the following wilt be <br />flow lines at any ongle other than 90-degrees thereto. Initial <br />used. <br />rolling will be started as soon as possible after the material <br />SHELL OIL COMPANY <br />hos been spread without causing excessive checking and will <br />XVII-4 <br />consist of at least two full coverages with the drive wheel. <br />HOUSTON, TEXAS <br />TOTAL PERCENT <br />-----SIEVE-SIZE---- PASSING-BY-WEIGHT <br />Finish rolling .will be started after the pgvement has cooled <br />sufficiently to permit removal of the roller marks and will be <br />GENERAL SPECIFICATIONS <br />1-1/2" (38.1 mm) 100 <br />continued in whutever direction is required to produce o dense, <br />I" (25,4mm) 80 - 100 <br />thoroughly compacted pavement, free of roller marks and show <br />RETAIL FACILITIES <br />3/4� (19.Omm) 70 - 90 <br />ing no significant movement under the wheels of the roller. <br />3/8 (9.51mm) 55 - 75 <br />Adjacent to the edge of oil flush concrete curbs. slabs, <br />SHEET �� 8 <br />No. 4 45 - 6'2 <br />gutters, drives, etc., the finished swface will be leftNo, <br />8 2.38mm35 - 50 <br />uniformly high so as to be 1/4" above concrete after <br />No. 30 0.595 11 19 - 30 <br />completion. <br />SCALE arD/APVD <br />14.76mm� <br />No. 50 0.297mm 13 - 23 <br />DATE NMVED <br />1LikEXE08rI <br />No. 100 0.149mm 7 - 15 <br />1 - 8 <br />Cvx n ON <br />1DR - 90098 <br />No. 200 0.074mm <br />I <br />