My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2009 PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3040
>
2300 - Underground Storage Tank Program
>
PR0506497
>
INSTALL_2009 PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:53 AM
Creation date
11/5/2018 12:06:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2009 PLAN
RECORD_ID
PR0506497
PE
2351
FACILITY_ID
FA0007461
FACILITY_NAME
7-ELEVEN INC #14113
STREET_NUMBER
3040
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10027018
CURRENT_STATUS
01
SITE_LOCATION
3040 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BENJAMIN HOLT\3040\PR0506497\INSTALL PLAN 2009.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIENT: <br /> VACUUM CONNECTION <br /> TO TANK SUMP M <br /> EXPLOSION PROOF ELECTRIC EXPLOSION PROOF ELECTRIC ELEVE■■ <br /> EQUIPMENT SCHEDULE 6 JUNCTION BOX TO BE MOUNTED JUNCTION BOX TO BE MOUNTED <br /> ITEM DESCRIPTION MANUFACTURER, PART NO. FURNISHED BY WITHIN MANHOLE WITHIN MANHOLE IN A ®® <br /> 1.5 HP VARIABLE <br /> POSITION <br /> BLE SPEED SUBMERGED PUMP FE PETRO NO. STP150-VL2-19 / STP-CBS 7-ELEVEN, INC 3/4" CONDUIT 12 <br /> O <br /> 2 HP VARIABLE SPEED SUBMERGED PUMP FE PETRO N0. STP-Y52-YL2 / MAG-VFC 7-ELEVEN, INC TO BUILDING 11 3/4" CONDUIT — <br /> O2 LINE LEAK DETECTOR VAPORLESS NO. 99LD-2000 7-ELEVEN, INC TO FILL SUMP At INFORMATION PROVIDED BY: <br /> 7 ANNULAR RISER <br /> 33 2'k2" BALL VALVE EMCO WHEATON NO. A0750-200 7-ELEVEN, INC O p { ,yq <br /> 4 LIQUID SENSOR IN FIBERGLASS SLEEVE VEEDER ROOT NO. 794380-208 7-ELEVEN, INC O t+�dlergrOUp <br /> O5 UNIVERSAL MOUNTING KIT VEEDER ROOT NO. 330020-012 7-ELEVEN, INC p O 12 _ t5 ergroup <br /> © CONDUIT TO STP MOTOR - G.C. <br /> 7 SPARE BUNG - _ 13 TO FILL SUMP "Planning <br /> -I *Architecture <br /> oGngineering <br /> © 22" FLANGE MWAY W/3-4" NPT FITTINGS - 7-ELEVEN, INC 10 <br /> • <br /> AN <br /> - O O *Project Management <br /> O9 42" CONTAINMENT SUMP XERXES CORPORATION 7-ELEVEN, INC <br /> 10 3" OVER 2" FIBERGLASS PIPE SMITH FIBERCAST RED THREAD II 7-ELEVEN, INC `^ ,..I _ 2322 West Third Street <br /> f ' ' p L • J Los Angeles,CA <br /> 11 <br /> 90057-1905 <br /> CONDUIT TO TANK & SUMP SENSORS — G.C. <br /> 10 • • • • Phone: (213)381-7891 <br /> 12 ELECT. CONDUIT ENTRY BOOT BRAVO NO. F-17—RR—D 7—ELEVEN, INC O O ( - Fax: (213)381-1517 <br /> 13 3" ENTRY BOOT W/CONCENTRIC REDUCER SMITH FIBERCAST NO. 012030-626-0 7—ELEVEN, INC B 3 <br /> p fiedlergroup.com <br /> 14 AUTOMATIC TANK GAUGE VEEDER ROOT N0. 848390-107 7-ELEVEN, INC -- - <br /> 15 VACUUM SENSOR KIT VEEDER ROOT N0, 330020-485 7-ELEVEN, INC O coesuLrANr: <br /> B O O <br /> 16 SIPHON CHECK VALVE (NOT SHOWN) FE PETRO NO. 406137937 7-ELEVEN, INC 14 17 <br /> 17 ATG RISER CAP & ADAPTER MORRISON BROTHERS NO. 305XP-IIOAC-EYR 7-ELEVEN, INC <br /> 18 12" MANHOLE EMCO WHEATON NO. A0717-22 7-ELEVEN, INC 5 <br /> 19 GROUND ROD CLAMP, BLACKBURN CAST BRONZE THOMAS & BETTS NO. JAH58 OR EQUAL G.C. 15 <br /> 20 CLAMP, BLACKBURN CAST BRONZE THOMAS & BETTS NO. J OR EQUAL G.C. 4 <br /> 21 RISER CLAMP, BLACKBURN CAST BRONZE THOMAS & BETTS NO. J2124 OR EQUAL G.C. 16 O2 Y <br /> 22 42" WATER TIGHT TURBINE SUMP MANHOLE COVER FIBRELITE NO. FL42 G.C. VTO PRO➢UCT PPWG NOTE : <br /> VACUUM SENSOR KIT ASSEMBLY <br /> TO BE INSTALLED AS HIGH AS <br /> POSSIBLE AND TESTED PER <br /> MANUFACTURER'S SPECIFICATIONS. <br /> r 1 ` EQUIPMENT SCHEDULE _ / 3 , MULTI—SIDED SUMP PLAN DETAIL (S:) VACUUM SENSOR KIT ASSEMBLY <br /> G7A SC: N.T.S. G7.p SC: 1 1/2"=I'—O" G7.0 SC: 1 1/2 1'-0" NO, DATE REVISION DESCRIPTION <br /> 1 04-01-0 REV, PER CLIENT <br /> VEEDER ROOT VACUUM PRESSURE SENSORS <br /> OTY. SENSOR/MAKE/MODEL LOCATION MODE <br /> 22 3 VACUUM SENSOR KIT #1 - PRODUCT PIPING ANNULAR <br /> 1 VEEDER ROOT 87 TURBINE #2 - TURBINE & FILL SUMP ANNULAR <br /> #330020-485 #3 - VAPOR LINE ANNULAR & ALL <br /> 12" MANHOLE 18 DISPENSER SUMPS ANNULAR <br /> EXPLOSION PROOF ELECTRIC �I4 - VENT LINES ANNULAR <br /> CONIC. SLAB - — 21 2 1g JUNCTION BOX TO BE MOUNTED 3 VACUUM SENSOR KIT & VENT SUMP ANNULAR <br /> \\'t WITHIN MANHOLE IN HORIZONTAL 1 VEEDER ROOT 91 TURBINE <br /> T POSITION #330020-485 #5 — PRODUCT�j6 - TURBINE &IFILL SUMP PING ANNULAR SEAL. <br /> GHOUNI) WLR}; 'f0 RISER : Ft n" ' — ' " LI o �QEdV,g#D�ssF ``i <br /> -� -1, <br /> ' GROUND 1t0D SPACER .- ... �G Fn c+ <br /> F Gln Z <br /> NOTES AND WARNIN Q A <br /> Z <br /> GROUND mss- __ __-.- - - n 't� t n .. w m <br /> 19 ROD CLAMP \, CONDUIT " `. ^ - n �. m a SIR. 3 3i8Ym1 'A <br /> rn <br /> -0" <br /> 1. SET STP PUMP & MOTOR ASSEMBLY 6" FROM THE BOTTOM OF THE TANK. CJVI\. <br /> GROUND ROD INTO 20 CLAMPS <br /> NATIVE SOIL 2. IMP PUMP TO BE USED IN ALL APPLICATIONS WHICH RAVE LESS THAN FOUR <br /> 4" RISER _ DISPENSERS AND 2BP PUMPS TO BE USED IN ALL OTHER APPLICATIONS. <br /> - AMOREX RING - MOUNT TO CONFIDENTIALITY STATEMENT <br /> 3. ALL PENETRATIONS THRU TURBINE ENCLOSURE MUST <br /> 9 TU.ox"N.em .xo m' x. ..N Nwra Nrwmc ro <br /> ( - BOTTOM OF SKIRT AND ALLOW n1.exouP G "Low . emN 'ORR mzN N <br /> . BE MADE BY QUALIFIED CONTRACTOR. THIS INCLUDES wxNDoGre mR TNe PRVNrz U.a evexaR zry <br /> I ( I III SPACE TO SUMP FOR DRAINAGE Pcvwxxt� ND PRt lWWTe U. ' cRPm <br /> ELECTRICAL CONDUIT. 2,H N PRr .1 GUM, NILE nvauslt To <br /> OmLRs.UDED io IM G000 wxnROMR acFPf AS <br /> — ( I 12 EXPRETSLr.4mDROZ x wFmNc 8({,EOErR cxouP.H!I <br /> �w"Raxiiv RS,YILRBI OVIRf�D UoRoF GeeeNOEMNDO me NONE <br /> ! 4. ALL TURBINE ENCLOSURES MUST BE INSTALLED AS .1.ro mE mR ..Rc mw WNO <br /> / 12 3/4" CONDUIT RECOMMENDED BY MANUFACTURER'S INSTALLATION DEVELOPMENT INFORMATION: <br /> TO BUILDING It TO ANNULAR IT INSTRUCTIONS. <br /> / 1 7-ELEVEN, INC. <br /> 5. ALL ELECTRICAL TO BE ABOVE FUEL LINE PENETRATIONS. <br /> 13 NEW 4 M.P.D. CANOPY <br /> 6. ALL PENETRATIONS MUST BE INSTALLED AS RECOMMENDED NEW U.G. STORAGE TANKS <br /> III I ! BY MANUFACTURER'S INSTALLATION INSTRUCTIONS. & RESTROOM ADDITION <br /> III- !NATIVE <br /> 30 TO FILL SUMP7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER <br /> SOIL INSTALLATION & PREPARATION PER MANUFACTURER'S SITE ADDRESS <br /> INSTRUCTIONS & SHALL REINSTALL SUMPS IF HYDROSTATIC <br /> TESTING SHOWS LEAKING IN THIS AREA OF THE SUMP. 3840 BENJAMIN HOLT DR. <br /> s • �• 13 B. CONTRACTOR SHALL PLACE THE LIQUID SENSOR AT 'f HE SUMP'S @ GRIGSBY PLACE <br /> STOCKTON, CA 95219 <br /> 5 LOW POINT AND AS CLOSE AS POSSIBLE TO PRODUCT PIPING. <br /> 15 vacuuM sYSIT31. STORE #14113 <br /> a SEE DETAIL 5 <br /> SHT. G7.0 DESIGNED BY: NTP FG PM: KE <br /> (TO BE PLACED AS SUMP JOINT NOTE: <br /> HIGH AS POSSIBLE) CONTRACTOR SHOULD USE RESIN SUPPLIED BY TANK MANUFACTURER CHECKED BY: NTP <br /> MEP PM: <br /> Y TO PROPERLY SEAL COLLAR AND SUMP CHANNELS. IN ADDITION, DRAWN BY: DO CONSULTANT PM: <br /> q - ---- - ------ -- - -- - ---- - �.- ---- -- - -- - ---- --- CONTRACTOR SHALL USE FIBERGLASS AND RESIN SUPPLIED BY TANK DATE: PROJECT NO: <br /> MANUFACTURER TO SEAL THE INTERIOR AND EXTERIOR OF SUMP E 04.01-09 12728 <br /> 101NTS 9PFCIFIC ATTFxTION SRALL BE GIVEN TO SURFACE PREP. <br /> W STP RISER THREADS AS TESTING REQUIREMENTS WILL DETECT THE SMALLEST OF LEAKS. DRAWING TITLE: <br /> DIRECTLY INTO MANWAY APPLY THREE(3) LAYERS OF GLASS LAYUP STAURATED WITH RESIN <br /> n BUNG. ATTACHMENT 360 DEGREES AROUND JOINT, OVERLAYING EACH SECTION OF MAT BY SUBMERSIBLE PUMP <br /> E FLANGE MUST BE TESTED I" IN THE CIRCUMFERENCE. 6" FRP MATTING SHOULD BE CENTERED <br /> g (RISER SUPPLIED BY 7-ELEVEN) AT THE JOINT $O THAT APPROXIMATELY 3" OF OVERLAY IS ABOVE DETAILS <br /> AND BELOW THE COLLAR AND RISER JOINTS. ALL MANUFACTURER'S <br /> INSTALLATION AND SAFETY INSTRUCTIONS SHALL BE FOLLOWED. ALL SHEET No: <br /> 6 MATERIALS SHALL HE COMPATIBLE WITH GASOLINE. <br /> V <br /> 2 GROUNDING DETAIL WHERE RE UIRED 4 MULTI—SIDED SUMP SECTION 6 NOTES - — GM <br /> G7.0 SC: NTS Gry,O SC: NTS Gry.O SC: NTS <br /> n <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.