Laserfiche WebLink
CLIENT: <br /> A EQUIPMENT SCHEDULE <br /> JUNCTION BOX STABILIZER PAINT BOLTS AND NUTS ITEM DESCRIPTION MANUFACTURER, PART NO. FURNISHED BY <br /> FROM FRAME OF DISPENSER BLACK TO BLEND WITH DISPENSER LOWER BEZEL-AXCESS TO <br /> MOUNTING BRACKET FRAME METER AND SHEAR VALVE O DISPENSER SUMP, DOUBLE WALL OPW FLEX-WORKS PART NO. FDS-4021-DW 7-ELEVEN, INC ELEVEn <br /> MOUNTING BOLT INSIDE OF DISPENSER LOWER BASE OF O N/A N/A - ®® <br /> CRIMPON LUGS 3/8" CRIMP ON DISPENSER FRAME <br /> TO WIRE / O3 STABILIZER BAR DPW FLEX-WORKS PART N0: SBO-0300 7-ELEVEN, INC <br /> CONNECTOR <br /> EXP. JUNCTION BOX O4 6" PIPE BOLLARD - 7-ELEVEN, INC <br /> VALANCE WITH GROUND 3/8" NUTS-TYPICAL {3) INFORMATION PROVIDED aY: <br /> 6 O5 RECONNECTABLE BREAKAWAY HEALY NO. 8701VV 7-ELEVEN, INC <br /> MPD <br /> 5 3/4" x 10" WHIP HOSE HEALY NO. 7513-010-SI 7-ELEVEN, INC g+ y <br /> X10 STANDARD WIRE 3/8" BOLT X 1 1/2' 3/4" <br /> PREMIUM CRIMPON LUGS O7 3/4" x B' HOSE HEALY N0.75H-OBD-5252 7-ELEVEN, INC <br /> TO WIRE CONCRETE SLOPE *Architecture <br /> CHECK WITH CONSTRUCTION MANAGER 7 CONDUIT AT BOX OB NOZZLE HEALY NO. 900EVR-FS 7-ELEVEN, INC <br /> CONTRACTOR TO DRILL 7/18° *Engineering <br /> OCTANE DECAL ARRANGEMENT (MIDGRADE HOLE IN BASE FOR O9 1-1/2" SHEAR VALVE, DBL POPPET DPW NO. BOVSP-1001 7-ELEVEN, INC <br /> ALWAYS TO BE AT CENTER.) MOUNTING GROUND � *Planning <br /> DISPENSER BOX QO VAPOR SHEAR VALVE DPW NO. 1OBF'P-5726 7-ELEVEN, INC aProject Management <br /> REGULAR Ba BB m lI FLEX CONNECTOR 1-1/2M x 2" FEMALE FLEXING N0. FF15XiBM346X2F 7-ELEVEN, INC LosAng2322 eles,CdStreet <br /> Los Angeles,CA <br /> WV <br /> 2'-0" 2'-0" 12 3" ENTRY BOOT W/CONCENTRIC REDUCER SMITH FIBERCAST NO. 012030-626-0 / NO. 012040-236-3 7-ELEVEN, INC 90057-1906 <br /> OR CENUT OR PE GENC C T� 7� 7 7 �-T r7 7�7-L T-1 7� T T P Phone: (213) 3817891 <br /> REQUIRMENT REQUIRMENT DISPENSER GROUNDING NDING DLj PAIL-Wl lEj RLj REQUIRED V IRLj D NTS <br /> A 13 LIQUID SENSOR VEEDER-ROOT NO. 794380-208 7-ELEVEN, INC Pax:(213) 381-1517 <br /> SHEARCLAMP (TYP.) <br /> 14 NOT USED - - fiedlergroup.Com <br /> 15 3/4" ELECTRICAL CONDUIT G.C. CONSULTANT: <br /> 16 2" IN 3" DOUBLE WALL PIPE, FIBERGLASS SMITH FIBERCAST, RED THREAD IIA 7-ELEVEN, INC <br /> 8° CONC, PVM'T 17 SENSOR MOUNTING KIT VEEDER-ROOT NO. 330020-012 7-ELEVEN, INC <br /> SHEAR GROOVE MUST BE FLUSH WITH TOP <br /> OF DISPENSER SUMP Ems 18 VACUUM HOSE VEEDER-ROOT PART NO. 332310-003 7-ELEVEN, INC <br /> U-BOLT 19 1/2" 3 WAY BALL VALVE VEEDER-ROOT PART NO. 332312-001 7-ELEVEN, INC <br /> REGULAR PRODUCT PIPING LJ <br /> PREMIUM PRODUCT PIPING <br /> it <br /> 13 <br /> 3 <br /> INSURE THAT DOLTS ARE TIGHTENED PER <br /> MANUFACTURE SPECIFICATION <br /> NO. DATE REVISION DESCRIPTION <br /> NOTE: CHECK ALL ANCHORING OF SHEAR VALVES. <br /> 1 04-0I-09 M. PER GWENT <br /> GILBARCO ENCORE 300 DISPENSER CALE: 8 TYPICAL PRODUCT SHEAR VALVE DETAIL SCS' <br /> SNTS 5 PARTS SCHEDULE NTS' 1 <br /> LI <br /> 2°= <br /> 0v NOTE: THE DEEP DISPENSER SUMP (FDS-4021-DW) SHOWN IS TO PROVIDE CONTAINMENT FOR <br /> b A THE GILBARCO ENCORE DISPENSER. PLEASE VERIFY THE INLET CONFIGURATION SHOW <br /> NOTES: a w 16 BELOW, <br /> 1. GAS CONTRACTOR TO INSTALL ISD READY/SPACER KIT p, <br /> BETWEEN FLANGES DURING CONSTRUCTION. INSTALLER WILL T-4" <br /> PLACE ISD FLOW METER & WIRING AT ONE TIME. 12 <br /> 3'-0" 1'-9" SEAL: <br /> 2. G.C. TO PROVIDE FUTURE J-BOX, SEALED & READY TO BE <br /> USED. STABILIZER BAR opµovEsslo <br /> CONCRETE 0 <br /> SUMP ANCHORS TEST Q �l� <br /> SENSOR PORT a 'A <br /> _ _ _ BASE OF DISPENSOR CABINET _ ND. C-38123 <br /> - - -- - I _. REHAB Exp. 3-31-2011 <br /> 15 S SPARE <br /> PA <br /> CORE <br /> NDUIT SUPPORTS <br /> 15 3/4" STEEL CONDUIT " CIV(l. �p <br /> V COPPER - FOR SUMP SENSOR <br /> I VAPOR RETURN LINE t° D A. UNION u <br /> - FROM DISPENSOR I <br /> I V BALL VALVE <br /> I � " CONFlDENi ALITY STATEMENT <br /> Y LIEOIER OPWP IR FNN NAS BEER NflM1.11 ,X <br /> T115 B0.YM[NL MVD INE MfORWTBN HFA[IN PEUiW6 l0 <br /> ,P,IWENBL NO INE fltNA2 USf OF IYMOR ifO <br /> I tel° CALV. ELL 3/4"DISPENSER <br /> STEEL CONDUIT FOR oNNfL oPB KRU . aL mPEO. <br /> UTMx,ul.n, O 111. B. msclOsm BR ,nvauaz m <br /> 15 DISPENSER POWER RISE EPs OP usEB TD un fxTEXL wwOSDENfR frOrm Ms <br /> FXPREssLr.V111gRIS0 M wW,P BI ITT.GRDUp..1 <br /> ISD PRESSURE SENSOR TO TOP OF JUNCTION BOX ExsoN, RRM En EOR..,RfDLnvw TNI. ..oP.. <br /> (INSTALL ONLY AT DISPENSER T-0" I, Z'-10" <br /> NOWMV, .BY Y.r HEREOF SE OUDAO TO IMA <br /> .YAELO 10 ME f9MfA,NO Pf511UC110N5. <br /> CLOSEST TO UST. SIDE VIEW END VIEW DEVELOPMENT INFORMATION: <br /> COMPRESSION FITTING CABLE 7-ELEVEN, INC. <br /> CABLE DOUBLE WALL DISPENSER SUMP AS SPECIFIED NTAB1�' 6 DOUBLE WALL DISPENSER SUMP SECTION NTS 2 NEW 4 M.P.D. CANOPY <br /> ISD FLOW METER <br /> NEW U.G. STORAGE TANKS <br /> 17 10 & RESTROOM ADDITION <br /> 15 9 <br /> BOLT TO STABILIZER BAR TOP PMT 1 <br /> PER MFR. INST. PLUG FOR ° " 15 3/4" STEEL CONDUIT ` . . " P - srcE aoDREss: <br /> SUMP SENSOR M <br /> z BLOCKAGE TEST 3 3/4" STEEL CONDUIT 9 <br /> o o SPARE CONDUIT 17 ` 3040 BENJAMIN HOLT DR. <br /> 15 DISPENSER POWE IT <br /> / @ GRIGSBY PLACE <br /> g <br /> 17 13 -- STOCKTON, CA 95219 <br /> s L - - — — - - - - - - - - - - - - - J 10 IM/ <br /> STORE #14113 <br /> 1/4" OD COPPER COMPRESSION MOUNT TO CORD GRN 18 Desmluco ev: NTP Tc PM: KE <br /> STABILIZER BAR <br /> TUBING AS REQ. FITTING - -- <br /> CHECKED BY: RE MEP PM: <br /> 10 SHEAR GROOVE MUST BE 19 c D <br /> 12 FLEXIBLE ENTRY FLUSH WITH TOP OF _ 5 DRAWN BY: DD CONSULTANT PM: <br /> BOOT DISPENSER ISLAND 11 CONNECTOR 18 0.... D <br /> DATE: PROJECT N0: <br /> E 7-BOX (SUPPLIED BY 04.01-09 12728 <br /> SUMP WALL CORD ) 34" <br /> GRIP GG DRAWING TITLE: <br /> 2 <br /> SEAL OFF O VAPOR 3 _ ,. �<�:< ENCORE 300 DISPENSER <br /> VAPOR LINE— (SCPPLIED BY 16 PIPE <br /> G.C. <br /> NOTES: DETAILS W/ FIBERGLASS SUMP <br /> 3" ON 2° FRP 2° BELLXMALE 1. SUMP TO BE WATER TESTED. <br /> 2 PIPESFRP PIPE FIBERGLASS THREADED 2. SUMP TO BE CLEANED OF DEBRIS AND DRIED AFTER TESTING. SHEET N0: <br /> ADAPTOR 012020-191-4 CONDUIT TO TLS 3. SHEAR SECTIONS OF SHEAR VALVES SHALL BE MOUNTED FLUSH WITH TOP OF ISLAND. <br /> CONSOLE 16 PRODUCT <br /> PIPE 4. LIQUID SENSOR MONITORING PANEL SHALL BE PROGRAMMED TO SHUT DOWN <br /> .� SUBMERSIBLE PUMPS UPON LEAK DETECTION. <br /> & FLOW METER AND PRESSURE SENSOR WIRING CAN SHARE 5. SLOPE PIPING TOWARDS TANK AT A MIN 1/8" PER FOOT. <br /> THE SAME CONDUIT TO CONSOLE (OBSERVE POLARITY) 8. MONITORING SYSTEM WILL SHUT DOWN TURBINE UPON DETECTION OF LEAK, SYSTEM <br /> FAILURE OR SYSTEM DISCONNECT. <br /> ]/� . o <br /> V{ <br /> —_— <br /> STAGE II VAPOR RETURN DETAIL NTs`� 9 DOUBLE WALL DISPENSER SUMP — PLAN VIEW '7 DISPENSER SUMP W RISER , SEE' 3 <br /> _.. <br />