Laserfiche WebLink
CLIENT: <br /> RS-500 RACK SYSTEM <br /> ELEVEn <br /> U ®® <br /> � a <br /> <a.. <br /> INFDRMATIDN PROVIDED BY: <br /> DRAIN <br /> a 9 rs <br /> fiedlergroup <br /> O <br /> _ 1 *Architecture <br /> 4 , oEngineering <br /> *Planning <br /> *Project Management <br /> 2322 West THird Street <br /> 12° Los Angeles,CA <br /> 90057 <br /> P/V VALVE +3" Phone (21 <br /> W.C./-8'W.C. 1 <br /> Phone: (213)381-9891 <br /> ( 3 1 VENT RACK FOOTING Fax: (213)381-1517 <br /> SEE HEALY DETAIL SHEET C9.0 SC: NTS <br /> FOR RISER MANIFOLD fledlergroup.com <br /> DETAIL CONSULTANT: <br /> TO HEALY UNIT <br /> _ OVERFILL ALARM SIGN EQUIPMENT SCHEDULE <br /> PER LOCAL AGENCY ITEk DESCRIPTION MANUFACTURER, PART NO. F'URN. BY <br /> REQUIREMENTS FLEX CONNECTOR 2" x IB" FLEXING NO. FF2OXIBM346X2F <br /> O FEMALE x MALE SWIVEL 7-ELEVEN, INC <br /> W TLS OVERFILL ALARM C.A.S., VALVES, FLAME ARRESTOR, AIR BREATHER, LOKING 2 DOUBLEWALL VENT TRANSITION SUMP BRAVO B-500-F2S-B-D-AB-VAC-EO-EBS 7-ELEVEN, INC <br /> Tr #790091-001 TO BE MIN. SLOPE IS 1/8" PER FOOT, BALL VALVES. SUPPLIED BY 7-ELEVEN, INC. <br /> MOUNTED AT 8'-0 100' MAXIMUM LENGTH 3 2" PRESSURE VACUUM VENT VALVE HUSKY #5885 7-ELEVEN., INC <br /> ABOVE GRADE <br /> IIQ NOT USED --------------------- --------- <br /> 2"0 VENT RISER P V VALVE +3W.C. -8W.C. 3 5" " AIR BREATHER ASSEMBLY MUST BE SAME ELEVATION AS <br /> / I 3" OVER 2" FIBERGLASS PIPE SMITH FIBERCAST, RED THREAD IIA 7-ELEVEN, INC <br /> /— — TOP OF P/V VALVE <br /> II <br /> NOTE: 1 " 1 O 4" OVER 3" FIBERGLASS PIPE SMITH FIBERCAST, RED THREAD IIA 7-ELEVEN, INC <br /> ALL CONDUCT FOR ALARM TO O LIQUID SENSOR VEEDER-ROOT 794380-208 7-ELEVEN, INC <br /> ADD ON POSITION FOR 3 � FLAME ARRESTOR ASSEMBLY <br /> DE INSIDE OF SQUARE TUBE 8 3" ENTRY BOOT SMITH FIBERCAST 012030-626-0 7-ELEVEN, INC <br /> FRAMEWORK 10 TANS O # <br /> O9 CONCENTRIC REDUCER SMITH FIBERCAST #012040-238-3 ---------- NO. DATE REVISION DESCRIPTION <br /> TANK MUST BE MOUNTED WITHIN 100' OF VENT RISERS 10 VENT RACK BRAVO RS-500-JP-3S 7-ELEVEN, INC t 04-01-09 M. PER CLIENT <br /> 2"x2"x2" 'Y" FITTINGAND PLACED ON CONCRETE SLAB OF B" MINIMUM <br /> FOR BLOCKAGE TEST THICKNESS. 11 NOT USED <br /> (Tn') Tr SHUT OFF SWITCH W/ BALL VALVE 12 UNIVERSAL MOUNTING KIT VEEDER ROOT #330020-012 7-ELEVEN, INC <br /> COVER TO BE MOUNTED (LUCKING) <br /> EXPLOSION IN W.P. J-BOX �II <br /> PROOF J-BOX PART #790095-001 ) TANK INTERSTICE FILL SUMP GAV <br /> rU VENT RISERS <br /> STAGE B VAPOR <br /> CAP EXTRA VENT RECOVERY <br /> 2'0 PENETRATION o <br /> SEAL OFF o o FITTINGS BY BRAVO <br /> N / <br /> GHT <br /> ACCESSI COVER \\ I 5 UAV U Y <br /> FINISHED GRADE - TANK MONITOR 5 i' <br /> 4 SEAL: <br /> 1 LJ <br /> RACK SYSTEM ' G9.0 SUB-PUMP <br /> STRUCTURAL TO TIS-350 oPA0f E5Slp,� <br /> SUPPORT \ TURBINE SUMP <br /> TO TIS-350 LL Na. C-38123 <br /> DRAIN <br /> Exp. 3-31-2011 <br /> 12 6 UAY >F <br /> 5 3Ti>Fp=�ffo" <br /> 2 <br /> UNLEADED <br /> 7 TANK mrsNcocuMum Am.TNETxNN., R. I.R.m <br /> '� S <br /> I.4.PoW IR x.I M. . nMNISMD IN <br /> �4 CUXi 001 EON ME PR. 0..1 A.I.. <br /> J PERSONNEL. NO PANT NEREOF SNN L BE COMM. <br /> L� WP 'w: gSLWwUn.U.JoREO OR W➢E...TO <br /> OMERS ON OSE.TO AVP Et...... E.O,AS <br /> EMPRESSLY MR,IORZM IN WRRIN. 9f EORUA GROUP.AVY <br /> PREMIUM p4 PERmn, itltM OR Ce'ReMOON NECEIWNO TOO NIsJ.w. <br /> Q ,gNMR. SWLL RY"I"I <br /> NEREM.E.EEMEO TO IUVE <br /> 4 TANK VENT RISER DTL <br /> TANK ,; a�' ,.NEE.T.THE MIR...NENAICMNS <br /> �4 ,v9 DEVELOPMENT INFORMATION: <br /> G9.0 SC: NTS o <br /> _ ° ���v 7-ELEVEN, INC. <br /> CONCRETE PAVING ASPHALT PAVING oa'`�`�' NEW 4 M.P.D. CANOPY <br /> 6" THICK CONCRETE 2" ASPHALT OVER 4" 6 `S NEW U.G. STORAGE TANKS <br /> PAVING W/ #3'S ® CONCRETE BRIDGE <br /> ovcQ� 5 & RESTROOM ADDITION <br /> 18" O.C. BOTH WAYS. ELECTRICAL 4�G <br /> APPLY CONCRETE SEALANT CONDUITS oQ' <br /> PER SPECS. — Its -SITE4�' - <br /> AJCRFSS: <br /> 3040 BENJAMIN HOLT DR. <br /> @ GRIGSBY PLACE <br /> SPECIFIED FILL m o��4 STOCKTON, CA 95219 <br /> S DOUBLE WALL VAPOR m B. GENERAL NOTES: STORE #14113 <br /> RECOVERY LINE o 0 0 1. ENHANCED LEAK DETECTION TESTING IS REQUIRED PRIOR TO BACKFILL. DESIGNED BY: NTP FG PM: KE <br /> a¢ CONTRACTOR IS REQUIRED TO NOTIFY OWNER'S REPRESENTATIVE WHEN <br /> > CHECKED BY: MEP PM: <br /> #12 STRANDED COPPER — PIPING IS READY FOR BACKFILL. KE <br /> TRACER WIRE _ _ _ _ PIPING DRAWN SY: OO CONSULTANT PM: <br /> 2. PIPING TO BE TESTED UNDER PRESSURE DURING BACKFILL PROCEDURE <br /> w � PIPING SCHEMATIC — FOUR MPD ACOMPACTION, <br /> NiD REAx IN sysTEM - cHEcx OFTEN DURING BACKFILL DATE: PRD EDT No: <br /> € 6" FILL OF 3/8" SECONDARY PIPING SC: NTS STACKED 04.01.09 1272$ <br /> „ PEAGRAVEL G9.0 3. STAGE II VAPOR RECOVERY PIPING TO BE PRESSURE TESTED FOR DRAWING TITLE: <br /> 8' v t/a a t/z. s' PRIMARY DECAY AND BLOCKAGE PRIOR TO BACKFILLING. <br /> G PRODUCT LINE 4 MPD • PIPING LAYOUT WI <br /> 36" WIDE TRENCH 4. PIPING TO BE CHECKED FOR CONTINUOUS SLOPE BACK TO THE TANKS. <br /> a5. IPV: UNLEADED, PREMIUM, VAPOR. HEALY CLEAN AIR TANKS <br /> NOTE: 6. ALL SUMPS ARE TO BE WATER TESTED. SHEET No: <br /> NOTE: IF CONDUIT OR WATER <br /> NEEDS TO CROSS TRENCH IT <br /> IF SHOULD DO SO PERPENDICULAR <br /> TO PRODUCT PIPE. a <br /> 5 SECTION THRU PIPING TRENCH G 9 r <br /> G9.0 SC: NTS <br /> in <br /> D <br /> 8 <br /> s <br /> a <br />