My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOURBON
>
1413
>
2300 - Underground Storage Tank Program
>
PR0231869
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 3:43:34 PM
Creation date
11/5/2018 12:12:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231869
PE
2361
FACILITY_ID
FA0003958
FACILITY_NAME
AT&T California - UE694
STREET_NUMBER
1413
STREET_NAME
BOURBON
STREET_TYPE
St
City
Stockton
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
1413 Bourbon St
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BOURBON\1413\PR0231869\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
1/24/2012 8:00:00 AM
QuestysRecordID
111774
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA -- �• <br /> STATE WATER RESOURCES CONTROL BOARD i Wim, 8 <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION • FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY 1 NEW PERMIT 3 RENEWAL PERMIT 6 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE ❑ B TANK REMOVED 1 <br /> DBA OR FACILRY NAME WHERE TANK IS INSTALLED: b '� - 0�— <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.• B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) D. TANK CAPACITY IN GALLONS: 000 <br /> ILTANKCONTENTS IFA-11S MARKED.COMPLETE ITEM C. <br /> 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ l.REG LAR 3 DIESEL ❑ 6 AVIATK)NGAS <br /> A F-] 2 PETROLEUM E] go EMPTY 1 PRODUCT ❑ ib PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> F-13 CHEMICAL PRODUCT ❑ 96 UNKNOWN E:] 2 WASTE ❑ 2 LEADEDDD L <br /> ❑ 99 JOTHER (DESCRIBE IN ITEM 0. BELOW) <br /> D. IF(A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.4: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.8.AND C,AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM F❑II 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> 1'-X <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 100% METHANOL COMPATIBLE W/FRP <br /> (PdmaryTmk) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 96 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 6 UNLINED F-] 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP 2514 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE 6 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 90 OTHER <br /> C. MATERIAL AND A 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELW/COATING A U 6 10D% METHANOL CAIAPATIBLE W/FRv <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A 99 OTHER LTA' <br /> D. LEAK DETECTION L] 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 MONITORING [:] OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ i VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING I� 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION p (C Z 43X ( 1 <br /> 1.ESTIMATED DATE LAST USED(MO/DAYNR) 2.ESTIMATEDQUANTITY OF 3.WAS TANK FILLED WITH YES [:] NO ❑ <br /> SUBSTANCE REMAINING GALLONS I INERTMATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS T RUE AND CORRECT <br /> IPAPPLICANTS NAME DATE <br /> WNTE.6 SK;NANRE) <br /> 5' <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW OIL <br /> COUNTY# JURISDICTION# �FACILITY# TANK <br /> STATE I.D.# FEE w I J In l 5 U It q S 1 <br /> P//ER��MIT NU PERMIT APPROVED BY/DATE PERMIT EX <br /> MUST BE <br /> T APPLICATION- <br /> M A,UNLESS A CURRENT FORM A HAS BEEN <br /> ,J1.J1 �G THIS E <br /> FILE THIS FORM WITH ACCOMPANIED <br /> LIOCAL AGENCYMPLEMENTIINGTERNDERGROUD STORAGE TANK REGULATIONS \To <br /> ��FORM B'('1/2'--9�1))^J1 ,K/ --/ter �AQ �1 ' _1 Y —I ��7T(� '-/'' <br /> e a) I )7N y I O �" — � FORODN6R6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.