Laserfiche WebLink
25. PIPING INFORMATION <br />PIPING INFORMATION <br />TANK# 7.- <br />TANK# <br />TANK# <br />4N11(NVm <br />1 <br />rt <br />DISTANCE from ?ie , W <br />USMXSER to TAIrKa <br />26. _�g' Piping (cross-sectional diagram, including connections to tank and dispensers). <br />VAI <br />Double wall piping or _ Secondary containment (Trench liner, etc.) <br />roUOO� <br />MANUFACTURER <br />p't'q' El <br />II <br />SYSTEM TYPE • <br />n <br />CONSTRUCTION <br />valve) <br />(3) Manways and other single walled pipe fittings on a�I <br />MATERIAL k* <br />double -walled tank, if not designed to prevent the <br />LEAK DETECTION SYSTEM <br />10 +0^� Surma <br />1 r lh M <br />100% METHANOL COMPATIBILITY with <br />FRP <br />N <br />CORROSION PROTECTION <br />Ac <br />&0, sm;}✓, R -d -Mrft4 <br />Fa qlw> <br />• System Type; sucti pressure, and ra it <br />9 -ti -Lined <br />Construction: Engle -walled, double-wa -trench, etc. <br />'TM Material Type; steel -iron, stainless-steel, fiberglass, etc. <br />26. _�g' Piping (cross-sectional diagram, including connections to tank and dispensers). <br />01 — �`j' <br />Double wall piping or _ Secondary containment (Trench liner, etc.) <br />�b <br />—Yi2 <br />(1) Product Lim(leak detector or automatic shut-off on <br />IiiYE-f� <br />pressurized piping). <br />C7-� <br />_ (2) Vent and vapor recovery lines if not designed to <br />prevent the entrance of standing fluids. (Ball float <br />valve) <br />(3) Manways and other single walled pipe fittings on a�I <br />double -walled tank, if not designed to prevent the <br />entrance of standing fluid. <br />27. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />28. Plan review and operating permit fees paid. <br />29. Monitoring and Response Plans submitted. <br />30. Proof of financial responsibility on file. 1 ,/ 9 <br />31. .L What is the approximate depth to ground water: ha+ kndur `�� f ( / �� n)ajffl ..... <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />32. K Total number of tanks on site after installation: O(Yt <br />33. 1. Any existing tanks to be removed or abandoned? YES NO I I If yes, submit State Water Resources <br />Control Board "Facility Permit (B)" application form. <br />34. P_L�& Responsible party(ies) shall submit a -Letter of Comitment• prior to the <br />installation of new tanks. (Applies to sites with documented soil and/or groundwater contamination) <br />35. _ County/City Fire District and Building Department notified. <br />36. REMARKS <br />---------------------------------------------------------------------------------------------------------------------------- <br />---------------------------------------------------------------------------------------------------------------------------- <br />---------------------------------------------------------------------------------------------------------------------------- <br />---------------------------------------------------------------------------------------------------------------------------- <br />---------------------------------------------------------------------------------------------------------------------------- <br />7 <br />