My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOURBON
>
1413
>
2300 - Underground Storage Tank Program
>
PR0231869
>
INSTALL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:55 AM
Creation date
11/5/2018 12:13:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994
RECORD_ID
PR0231869
PE
2361
FACILITY_ID
FA0003958
FACILITY_NAME
AT&T California - UE694
STREET_NUMBER
1413
STREET_NAME
BOURBON
STREET_TYPE
St
City
Stockton
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
1413 Bourbon St
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BOURBON\1413\PR0231869\INSTALL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST 'ISTALLATION INSPECTION REC "iD <br />FACIL.TY MAME: II ADDRESS: �L <br />SIIEEPSO TANK/ ULS l' TANK NOOEL/MATERIAL: <br />CAPACITY: '3 00(0 PRODUCT. U c( 2 ` R.E.H.S: <br />INITIAL INSPECTIONS <br />A <br />I <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: RRIME(LIQUID ANNULAR): OTHER: <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />4. PRIMARY TANK TEST: PSI: HRS/MIN- <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />5. TANK APPROPRIATELY PLA® WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />R <br />T <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />0 <br />I <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (0) <br />V <br />A <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br />E <br />L <br />18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br />0 <br />S <br />19. TANK INTEGRITY TEST (PASSING HARD COPT) (CCR 2635 (A) (5)) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />21. 'C• FORK COMPLETED AID SUBMITTED (CCR 2635 (E)) <br />1. UST PLANS SUBMITTED/ FEES PAID (HK CODE 25287, CCR 2635 (D) (8) <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />INITIAL INSPECTIONS <br />PIPING INSPECTIONS <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: RRIME(LIQUID ANNULAR): OTHER: <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2635 (A) (4)) <br />4. PRIMARY TANK TEST: PSI: HRS/MIN- <br />8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (A)) <br />5. TANK APPROPRIATELY PLA® WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIM) (CCR 2635 (B) (4)) <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2635 (A) (4)) <br />8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (A)) <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (0) <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br />FINAL INSPECTION <br />EH23-006 3/92 (REVISED 11\92) <br />12. PERFORMANCE TEST FOR 'ALL' MONITORING PROBES (CCR 2632 (C) (2)) <br />13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br />14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (8) (5)) <br />15. PERFORMANCE TEST OF AIROMATIC PUP SYSTEM SHUT-OFF (CCR 2635 (6) (5)) <br />16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br />17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br />18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br />19. TANK INTEGRITY TEST (PASSING HARD COPT) (CCR 2635 (A) (5)) <br />20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK CM SITE (COR 2632 (E) (1) (2)) <br />21. 'C• FORK COMPLETED AID SUBMITTED (CCR 2635 (E)) <br />22. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br />23. ALL COW(TIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br />EH23-006 3/92 (REVISED 11\92) <br />
The URL can be used to link to this page
Your browser does not support the video tag.