My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BUDWEISER
>
3932
>
2300 - Underground Storage Tank Program
>
PR0231529
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:58 AM
Creation date
11/5/2018 12:36:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0231529
PE
2381
FACILITY_ID
FA0003585
FACILITY_NAME
DELTA-SIERRA BEVERAGE LLC
STREET_NUMBER
3932
STREET_NAME
BUDWEISER
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
10118036
CURRENT_STATUS
02
SITE_LOCATION
3932 BUDWEISER CT
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BUDWEISER\3932\PR0231529\REMOVAL 1989.PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
1/20/2012 8:00:00 AM
QuestysRecordID
111065
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTH CAL CONSTRUCTION (NCC) STANDARD OPERATING <br /> PROCEDURE (SOP) # 88.005 <br /> GENERAL GUIDELINES FOR UNDERGROUND TANK REMOVAL <br /> 1 UNDERGROUND STORAGE TANK RFaanver c <br /> The following procedures should be used prior to the removal <br /> of any underground tank that previously stored a flammable <br /> or combustible liquid. In addition, the procedures outlined <br /> below must be followed to ensure that the entire preparation <br /> and removal operation is conducted in a safe manner and the <br /> possibility of an explosive incident is minimized. <br /> A. Plan Review/Schedule of Rgmoval <br /> The following sequence is required to ensure prompt <br /> and successful removal inspections: <br /> ° Upon receipt of the a2219Ved plana from <br /> Environmental Health, forward one set to <br /> Local Fire Department, and one set to the <br /> local building department. <br /> At least 2 working days prior to the removal <br /> of underground storage tank($), contact the <br /> local Fire Prevention Field Department and <br /> Health Department. <br /> B- Removal/Oa-Cite Proc <br /> North Cal Construction shall ensure that gl) <br /> flammable liquids/materials have been removed <br /> from the tank(s) by means of an approved vacuum <br /> truck prior to excavation. <br /> Under no circumstances shall welding equipment, <br /> torches or any device capable of acting as an <br />
The URL can be used to link to this page
Your browser does not support the video tag.