My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BUDWEISER
>
3932
>
2300 - Underground Storage Tank Program
>
PR0231529
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:58 AM
Creation date
11/5/2018 12:36:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0231529
PE
2381
FACILITY_ID
FA0003585
FACILITY_NAME
DELTA-SIERRA BEVERAGE LLC
STREET_NUMBER
3932
STREET_NAME
BUDWEISER
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
10118036
CURRENT_STATUS
02
SITE_LOCATION
3932 BUDWEISER CT
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BUDWEISER\3932\PR0231529\REMOVAL 1989.PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
1/20/2012 8:00:00 AM
QuestysRecordID
111065
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ignition source be located within 50 feet of <br /> the tank to be inerted. <br /> Underground tanks that previously contained Class <br /> I or II flammable liquid shall be inerted prior <br /> to excavation. <br /> The top of the tank shall be exposed to provide <br /> access to all of the tank openings. <br /> Any piping containing product shall be carefully <br /> disconnected and the contents shall be disposed of <br /> in an approved manner. All piping associated with <br /> the underground tank shall be removed and disposed <br /> of. <br /> Remove all possible products from the tank by <br /> means of an approved pump with suction resting <br /> on the bottom of the tank. All products shall be <br /> properly disposed of. <br /> All remaining piping and drop tube may be <br /> disconnected/removed from the tank. <br /> Two openings at opposite ends of the tank shall <br /> be used for the inerting procedure; all other <br /> openings shall be sealed. <br /> A flammable vapor detection device that has been <br /> calibrated within the past 6 months shall be on <br /> the job site prior to excavation or removal. <br /> Tanks shall be purged of flammable vapor in <br /> accordance with NFPA guidelines. It shall <br /> be the North Cal Construction's responsibility <br /> to demonstrate to the fire inspector, upon <br /> arrival, that the vapor concentration inside t►e <br />
The URL can be used to link to this page
Your browser does not support the video tag.