My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
1246
>
2300 - Underground Storage Tank Program
>
PR0501024
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 11:12:18 AM
Creation date
11/5/2018 12:40:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0501024
PE
2381
FACILITY_ID
FA0004964
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
1246
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15102203
CURRENT_STATUS
02
SITE_LOCATION
1246 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARDING\1246\PR0501024\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
5/14/2013 8:00:00 AM
QuestysRecordID
161533
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEOFCAUFORMA ��w:•,_•� 1 <br /> STATE WATER RESOURCES CONTROL BOARD s <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B "° <br /> y� '1 <br /> O <br /> (r.ul . . <br /> COMPLETE A SEPARATE FORM FOR TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SRE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 0 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED 0 <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: c <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNERS TANK I.D.• B. MANUFACTURED BY: v!`— <br /> C. DATE INSTALLED(MO( AYNEAR) l./ D. TANK CAPACITY IN GALLONS: <br /> II.TANKC TENTS IFA-1 ISMARKED,COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL 0401 L B. C. ❑ laU ELEADED ULAR 3 DIESEL ❑ 6 AVIATIONGAS <br /> a GASAHOL <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT ❑ 1b NLEADLIM ED 5 JET FUEL ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADED 90 OTHER (DESCRIBE N ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.V: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.S.AND C.AND ALL THAT APPLES IN BOX O AND <br /> A. TYPE OF ❑ I BLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 S WALL ❑ l SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 0 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrImArYTMII) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 Ad6D LINING ❑ 3 EPDXY LINING ❑ { PHENOLIC LINING <br /> C.INT ERIOR F75 GLASS LINING 8 UNLINED ❑ 05 UNKNOWN ❑ 99 OTHER <br /> NING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 TING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 6 CATHODIC PROTECTION 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR <br /> NDERGROUNO,BOTHIFAPPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A 2 PRES A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 INCL W A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U a FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 8 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ MNTERS <br /> ONRORING ❑ oD OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ A AUTOMATIC TANK GAUGING❑ 5 GROUNDWATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIALMONITORING ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MOIDAYNR4) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES NO <br /> 0 — C SUB STANCE REMAINING GALLONS INERT MATERIAL? ❑ <br /> EK <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE IS TRUE AND CORRECT <br /> APPUCANTSNAME DATE <br /> IIhIKi[D s n9KArurM <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY 9 JURISDICTION A FACILITY• TANK• Cy,�-vim <br /> STATE LDA ® FTTI / I/IT13T- <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE ?'l <br /> C- d ' <br /> u - i- J <br /> FORM 8 (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> arm <br />
The URL can be used to link to this page
Your browser does not support the video tag.