My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
1246
>
2300 - Underground Storage Tank Program
>
PR0501024
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 11:12:18 AM
Creation date
11/5/2018 12:40:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0501024
PE
2381
FACILITY_ID
FA0004964
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
1246
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15102203
CURRENT_STATUS
02
SITE_LOCATION
1246 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARDING\1246\PR0501024\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
5/14/2013 8:00:00 AM
QuestysRecordID
161533
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> Iy, . <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT CiffS CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ d AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: (r 'i- <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK 1.0.A B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAYNEAR) (�l D. TANK CAPACITY IN GALLONS: w <br /> II.TANK CONTENTS IFA-11SMARKED,COMP ITEMC. <br /> p ❑ 1 MOTOR VEHICLE FUEL A OIL B. C. ❑ la REGULAR <br /> 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM Q BO EMPTY ❑ 1 4 GASAHOL T ❑ 1pUNLEADEO 5 JET FUEL ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PROWCT O 95 UNKNOWN 2 WASTE ❑ 2 LEADED W OTHER (DESCRIBE IN ITEM 0. BELOW) <br /> 0. IF(Ai)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.x: <br /> III. TANK CONSTRUCTION, MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALL THAT APPLIES IN BOK 0 AND E <br /> A. TYPE OF ❑ 1 BLE WALL F73 SINGLE WALL WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM Z LE WALL ❑ A SECONDARY CONTAINMENT (VAULTED TANK) 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL F-13 FIBERGLASS O a STEEL CLAD WI FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 6 CONCRETE 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM 8 tao% METHANOL COMPATIBLE WIFPP <br /> (PTimuyTm*) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ O LINING ❑ 3 EPDXY LINING ❑ A PHENOLIC LINING <br /> C.INTERIOR F-15 GLASS LINING 8 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100%.METHANOL? YES_ NO— <br /> D.CORROSION ❑ i POLYETHYLENE WRAP ❑ 2 NG 3 VINYL WRAP ❑ A FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION ECUtPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNOOR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A 3 OMVI A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U A FIBERGLASS PIPE <br /> CORROSION A U S ALUMINUM A U 6 CONCRETE A U 7 STEEL W COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ <br /> MONITORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ A AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MOAAYIYR) 2.ESTIMATED OUANTRY OF 3.WAS TANK FILLED WITH YES [::] NO <br /> O -5; SUBSTANCE REMAINING GALLONS INERTMATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANT'S NAME OATS <br /> IPgIRTEO A SKiNANRE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTYx JURISOICTK)Nx FACIL(TVx TAW <br /> STATE ��c'vcae'o <br /> LD.# 91 FFR j � <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION WTfe_ -/_ q7� <br /> FORM 8 (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.