My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
COMPLIANCE INFO 2013 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2019 2:50:46 PM
Creation date
11/5/2018 12:44:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2015
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARDING\244\PR0231137\COMPLIANCE INFO 2013 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2015
QuestysRecordDate
7/21/2016 11:31:35 PM
QuestysRecordID
3150426
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br />Software Version Installed. <br />:om lete the foil <br />REGEIv`: <br />SEP 16 2015 <br />r-.nnnAKIRACAITAI <br />® Yes <br />❑ ^No* GI <br />Is the audible alarm operational? A .T4 nCOti 01fil1T <br />® Yes <br />❑ No' <br />Is the visual alarm operational? <br />® Yes <br />❑ No' <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />® Yes <br />❑ No' <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere whh their proper <br />operation? <br />❑ Yes <br />❑ No' <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br />® NIA <br />® Yes <br />❑ No' <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br />❑ NIA <br />fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) ® SumpfTrench <br />Sensors; ® Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ® Yes; ❑ No. <br />O Yes <br />❑ No' <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br />® NIA <br />installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating property? If so, at what percent of tank capacity <br />does the alarm trigger? 0 <br />❑ Yes <br />® No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br />and model for all replacement parts in Section E, below. <br />OYes' <br />® No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />N Yas <br />❑ No' <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />® Yes <br />❑ No' <br />I Is all monitoring equipment operational per manufacturer's specifications? <br />• In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. comments: INSPECTOR CINDY ON SITE. ALL PASSED <br />Monitoring System Certification Page 2 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.