Laserfiche WebLink
In S <br />`. 'kill <br />F. In -Tank Gauging / SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipmR RECEIVED This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. ``GG■■ <br />Complete the following checklist: , <br />❑ <br />Yes <br />❑ <br />No' <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system product level readings tested? ENVIRON <br />LJQAITU <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />Joe Leak Detectors (LLD): <br />Comnlefe the fnllnwinn rherkliaf <br />❑ Check this box if LLDs are not installed. <br />YES <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate: ® 3 g.p.h.; [10.1 g.p.h ; ❑ 0.2 g.p.h. <br />YES <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />YES <br />Was the testing apparatus properly calibrated? <br />YES <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />NA <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />NA <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />NA <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />NA <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />YES <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />87 120 3 26 21 PASS <br />91 100 4 21 15 PASS <br />Monitoring System Certification Page 3 o1`4 2/1-1/07 <br />7 <br />JTAL <br />CRIT <br />