My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2300 - Underground Storage Tank Program
>
PR0501853
>
REMOVAL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 1:00:01 PM
Creation date
11/5/2018 12:49:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1992
RECORD_ID
PR0501853
PE
2381
FACILITY_ID
FA0005245
FACILITY_NAME
Granite Construction Company-French Camp Facility
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
Rd
City
French Camp
Zip
95231
APN
193-270-03
CURRENT_STATUS
02
SITE_LOCATION
10500 S Harlan Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\10500\PR0501853\REMOVAL 1992.PDF
QuestysFileName
REMOVAL 1992
QuestysRecordDate
5/9/2013 8:00:00 AM
QuestysRecordID
158648
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Level D: Normal work clothes , rubber gloves , boots (work type) , <br /> and hard hats . <br /> The following protective materials are required for involved <br /> substances : Material <br /> Substance Vork clothes, boots , gloves <br /> Dieselgasoline, <br /> waste oil <br /> respirators are authorized, charcoal is the <br /> If air-purifying <br /> nces and <br /> appropriate canister for usei dividual has with the o determined athat all <br /> concentrations . A comp e of respiratory protection have been <br /> criteria for using this typ <br /> met . SPECIFIED <br /> OF <br /> NOTHOUT THE APPROVTo THE AL OF THE PROJECTS TEAM LEADER. <br /> TION SHALL BE MADE <br /> G. ON-SITE WORK PLANS <br /> Work Party(s) consisting of 3 persons will perform the following <br /> tasks : ( function) <br /> Supervisor <br /> Project Foreman Team Mike Fuller Recordkeeper <br /> To be given Labor <br /> Work Party #1 Safety <br /> The work party( s) were briefed on the contents of this plan at <br /> the start of the project . <br /> H. COMMUNICATION PROCEDURES <br /> one should remain in constant voice <br /> Personnel in the Exclusion Z <br /> contract or within sight of the Project Team Leader . <br /> Three Horn Blast is the emergency signal to indicate that all <br /> personnel should leave the work site . In addition, a loud hailer <br /> is available if required. <br /> The following standard hand signals will be used: <br /> in throat---------------Out of air, can ' t breathe <br /> Hand gripp 9 <br /> Grip partner ' s wrist or both hands-Leave area immediately <br /> around waist------------ <br /> Hands on top of head---------------Need assistance <br /> ---OK, I 'm alright, <br /> Thumbs up--------------- I understand <br /> Thumbs down--------------- <br /> No, negative <br /> Telephone communication <br /> Thto the command e phone number iss ( 2 9)should <br /> b established <br /> as soon as practical. <br /> PAGE 3 OF 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.