My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2300 - Underground Storage Tank Program
>
PR0501853
>
REMOVAL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 1:00:01 PM
Creation date
11/5/2018 12:49:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1992
RECORD_ID
PR0501853
PE
2381
FACILITY_ID
FA0005245
FACILITY_NAME
Granite Construction Company-French Camp Facility
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
Rd
City
French Camp
Zip
95231
APN
193-270-03
CURRENT_STATUS
02
SITE_LOCATION
10500 S Harlan Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\10500\PR0501853\REMOVAL 1992.PDF
QuestysFileName
REMOVAL 1992
QuestysRecordDate
5/9/2013 8:00:00 AM
QuestysRecordID
158648
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Personnel injuries in the Support Zone: Upon notification of any <br /> injury at fob site, the Project Team Leader and Site Safety <br /> Officer will assess the nature of the injury. If the cause of <br /> the injury or loss of the injured person does not affect the <br /> performance of site personnel, operations may continue. If the <br /> injury increases the risk to others, the designated emergency <br /> signal (three horn blast) shall be sounded and all site personnel <br /> shall move beyond the work area and await further instructions . <br /> Activities on site will stop until the added risk is removed or <br /> minimized. <br /> Fire/Explosion: Upon notification of a fire or explosion on <br /> site, the designated emergency signal (three horn blast) shall be <br /> sounded and all site personnel assembled. The fire department <br /> shall be alerted and all personnel moved to a safe distance from <br /> the involved area. <br /> In all situations, when an on-site emergency results in <br /> evacuation, personnel shall not re-enter until: <br /> 1. The conditions resulting in the emergency have been <br /> corrected. <br /> 2. The hazards have been reassessed. <br /> 3. The Site Safety Plan has been reviewed. <br /> 4. Site personnel have been briefed on any changes in the Site <br /> Safety Plan. <br /> 5. Personnel Monitoring. <br /> The following personnel monitoring will be in effect on <br /> site: <br /> Medical Monitoring: The expected air temperature will be <br /> 600F. If it is determined that heat stress monitoring is <br /> required (mandatory if over 700F) , the following procedures <br /> will be followed: pulse rate. <br /> All site personnel have read the above plan and are familiar with <br /> its provisions . <br /> Name Signature <br /> Project Team Leader Mike Fuller <br /> Other Site <br /> Personnel <br /> PAGE 5 OF 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.