Laserfiche WebLink
Dec 04 00 09: 16a Me Brown 2051-461 -6342 p. 3 <br /> 03 <br /> For J=V modeja 9. Agts the enclosed decals tothe dispenser dial glda,an- <br /> a. Reprove L4-inch pipe plug from tank Eastport in grade of gasolmet,upoa which the leak detector ia.. <br /> the Packer(on 6-inch Bit-Flo applications, re- being iatadled Additionai•deralaare.available;roll <br /> move the 1/4-iamb pipe plug from the nater/flange c tumureervitsfatl-8D0c962-8348er(913)498-570e; <br /> ae9emhly). 10. Inspect all thmadedjointe m assure they are nght and. <br /> b. Apply a UL-classified non-toric pipe thread seal- not leaking. - <br /> ant to the 1/4-inch NFT 45-degree elbow and <br /> install in tank test port of the pecker.On 6-1ach Test of the Leak Detector <br /> Big-Flo applications,the 1/4-inch NPT 45-degree <br /> elbow may be installed into the nser/flange U.S.Environmental Protection Agency(EPA)regulations re- <br /> assembly. quire annual verification of operation of leak detector. To <br /> C InAtali a 1/4-inch NET tee on the 45-degree elbow assure maintenance of leak detection capability, Red Jacket <br /> Chat is in the tank test port(or on 6-inch Big-Flo requues thataperedoa of the mecha_nicou-lealt deuetor..be. .. <br /> neer/flange assembly)to accommodate both the verified by testing upon sLan-up and that.testing of the leak <br /> vent tube and snap tap. <br /> defector be performed routinely at least anusLar- <br /> n - <br /> it Apply a e threads <br /> o f hop-toac pipe thread agree � Test peoeedure options for meehi mioal <br /> antro vent <br /> ofthe <br /> nd install <br /> llin the <br /> leakdeteeton araarylainedia Red,laeket <br /> elbow vent tube fitting and ipetpi t the tee. Engineering Reports RJ20 and RJ21.The <br /> e. ant to the <br /> a threads of non-tome pipe thread Beal Red Jacket Snap Tap connector, allow <br /> ant to the threads of the V4-inch NFP straight the F% WKILDVleakdeteatorto betested <br /> vent tube fitting and install in the leak detector with the F1rV Snap Tap Tearer u an op- <br /> vent opening in the cap of the leak detector tion to the above test methads.Bee Iced <br /> f Inalla1-1 the vent tithing into both utgngs and Jacket Btorature 8041.111-1 for teat ia. <br /> tighten. structione using Snap Tap Conasecore. <br /> C. To install snap tap romectcrs in FX2V/MDV <br /> models, apply a UL<lasstfied non-tont pipe 11. The top rover on the Red Jacket leak detector is <br /> thread sealant to the snap tap coanecrare and designed W accommodate%sealing wire which can be <br /> install one in the body of the FAV leak detector used to discourage tampering or the unauthorized <br /> andthe other in the tee attached to the 45-degree removal of the leak detector(sea Figure 2). <br /> elbow installed is the tank test port ofthe packer <br /> On1110010M It should be pored that if the dla apsing <br /> flinch Big Flo appIlca5ona, install the two D <br /> snap tap connectors — one in the FXV leak ayatem(theaolenoidvalvea dthenoszk) <br /> detector and one in the nsertlange assemblyis opened previous to the completion or <br /> It. Attach and crimp loop of the retaining tether the line teat, the FXV Series will detect <br /> this opening"a leak and restricted flow <br /> i. ReplacC the cape <br /> amtmd the copnap Tap threads. will result. Closing of the noatle(s)for a <br /> over the quick-correct moue period of time adequate to Wow comple. <br /> plings and tighten snugly, tion of the line test will show the leak <br /> N t= ' <br /> DO NOT oyerttghten. detector to open.Once opened.fail pump <br /> ECEM <br /> flaw can be provided. <br /> See tecbdeal bulletin 0042.111.1 for use <br /> or Snap Tap Connector Assembly. <br /> 7. Connect power W pump at the load center. F%2V/FXED <br /> A. Clear remtuning air from system as follows' <br /> a. Turn an dispenser that is farthest from the leek TETHERED <br /> detector but do not open nozzle.Wait fotuor five CAP <br /> minutes or more. Look for leaks on parte <br /> worked on. SNAP TAP <br /> b. Shutoffthepump andanow it toataad faurorfive 45'ELBOW <br /> minutes. Then start the pump again and <br /> open the nozzle farthest from the leak detector. �� <br /> a Coatinue to dispetlee enough gasoline,about 20 TV <br /> I <br /> to 30 gallons(76 to 114 liters), to pump ALL air �J <br /> from the system. Figure 1 <br /> If flow is restricted to about a gpm <br /> (11 IPm)or leas with the aottle open,the <br /> leak datgetor has not opened.Repeat step O <br /> Be with increased rnaning time of pump <br /> to insure the purging of It air. All air SEALING WIF1E <br /> must be purged from the system or the (Provided by contractor) <br /> leak detector will restrict flow to eboat 0 <br /> 3 Wpm III Ipm). <br /> i sI <br /> ® <br /> Marley Pump t leo- 1/4-INCH <br /> r UnteE aemaam Cans�ry <br /> T FITTING <br /> 7401 W. 729 St.•Overland park,KS 66213•913-498-5700 ,o <br /> Marlay Pump RStryee IEe rlghl to make dealgc impto,menes ono <br /> pricing modilimilons as necessary and Witnout nolice. VENT TUBE <br /> ®t 998 Marley Pump PlInted in USA Figure <br />