Laserfiche WebLink
3. PLAN REVIEW GUID" TNES <br /> %wof %--.1 <br /> a. The enclosed pian review sheet is provided for your information to assist you in interpreting <br /> our requirements for your new UST system. <br /> b, A copy of the California UST Regulations may be obtained from the State Water Resources <br /> Control Board at (916) 739-4332 <br /> C. Permits and/or plan check approval may also be required by the San Joaquin Air Pollution <br /> Control District,County/City Building Department and Fire District in your respective area. <br /> d. Complete and submit the State Water Resources Control Board "Facility Permit (A)" and <br /> Tank Permit (B)"application forms. <br /> C. A minimum of 3 inspections will be conducted on the UST system installation. A S35 per <br /> hour inspection fee may be charged for additional inspections or reinspection as required. <br /> (See required inspections below) <br /> f. Applicant/contractor to adhere to the approval plan and any change or deviation shall be <br /> reported and approved by PHS/EHD prior to installation. <br /> g- Tank installation permit shall expire six(6)months after the permit approval date. All work <br /> must be completed within six (6) months, <br /> 4. REQUIRED INSPECTIONS <br /> All appointments for inspections must be made at least 48 hours in advance for the following <br /> a. Primary and secondary tank(s)shall be testedpneumatically at 3-5 ps.i. for one hour,one- <br /> half hour for primary tank and,one-half hour for secondary tank. Double walled tanks are <br /> exempt if annular.space is monitored using either pressure or vacuum testing (All external <br /> .connections shall be soap tested while under pressure) <br /> b. Pressure piping.shall be:hydrostatically tested to 1500/5 or pnuematically tested to 110% of <br /> maximum anticipated system pressure but does not less than 5 lbs, per square inch at the <br /> highest point of the system for a minimum of 20 minutes. <br /> Q All lines other than pressure piping shall be pressure tested at not less than 3 ps.i. and not <br /> more than 5 ps.L for a minimum of 20 minutes and soap tested while under pressure. <br /> d. Containment sumps shall pass a 24 hour leak test. <br /> e. Overfill protection shall be capable of draining liquid back into fuel tanks. <br /> e. Monitoring system shall pass a functional test. The functional test shall consist of the <br /> activation of the alarm via the monitoring probes/sensom <br /> L Final inspection and approval to operate will be granted after the above requirements are <br /> satisfied and a hard copy of the precision test is submitted to inspector at site. <br /> The contractor's approved printset of the UST installation shall kept at the job site and must be shown to the <br /> inspector upon request. In addition, the Leal Fire Department shall approve UST installation prior to <br /> commencement of work <br /> If you need further assistance, or wish to schedule an appointment to discuss the plan review or field <br /> inspection,please contact our Underground Storage Tank Staff at (209) 468-3427. <br /> 2 <br />