Laserfiche WebLink
3. PLAN REVIEW GUIDELINES <br /> a. The enclosed plan review sheet is provided for your information to assist you <br /> in interpreting our requirements for your new UST system. <br /> b. A copy of the California Underground Storage Tank Regulations may be <br /> t <br /> obtained from the State Water Resources Control Board at (93.6) 739-4332. <br /> C. Permits and/or plan check approval may also be required by the San Joaquin <br /> Air Pollution Control District, County/City Building Department and Fire <br /> District in your respective area. <br /> d. Complete and submit the State Water Resources Control Board "Facility(A)" <br /> and 'Tank Permit (B)" application forms. <br /> e. A minimum of 3 inspections will be conducted on the UST system installation. <br /> 53 A 135-per hour.inspection fee may be charged for additional inspections or <br /> reinspection as required. <br /> f. Applicant/.contractor to :adhere to the approval plan and any change or <br /> :deviation shall be reported and approved by PHS/EI-ID prior to installation. <br /> g. Field inspections associated with the plan review process shall be scheduled <br /> (43) hours in advance. <br /> If you need further assistance, or wish to schedule an appointment to discuss the plan review <br /> or field inspection, please contact our Underground Storage Tank Staff at (209) 468-3420. <br /> 2 <br />