Laserfiche WebLink
4. �r'4 Tank cross-sectional diagram included on blueprints. <br /> S. ✓ Detail of tank, piping system, excavation and cover. <br /> 6. Tank(s) and piping approved by a nationally recognized independent testing <br /> �, organization. [Title 23, Subchapter 16, Article 3, Sec. 2631 (r) & 26351 <br /> 7. NLA Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. [Section 2635 2 <br /> 3. 6Z4 Manufacturer's written installation instructions for tank(s), piping, monitoring <br /> devices, etc. [Section 2635 (b) (5)] <br /> 9. Tightness Test (NEPA 30) is required on both primary (10) and secondary <br /> (2°) containment systems before covering. [Section 2635 (b) (6) & (7)] <br /> 10. Double walled tanks using pressure or vacuum testingto monitor the <br /> space. [Section 2635 (b) (7)] annular <br /> 11. NFPA 329 " recision Test" required upon completion of installation with tank <br /> in operating condition. Test results to be submitted directly to PHS/EHD <br /> from the testing company or owner of facility. [Health & Safety Code, <br /> Division 20, Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION <br /> TANK # # 1 # # # # <br /> CAPACITY )D 00 0 <br /> MANUFACTURER opt <br /> COMPOSITION S �L <br /> MODEL sr-P3 <br /> PRODUCT DO�&S4 L <br /> CORROSION CATP0 0►C <br /> PROTECTION <br /> U.L. LISTED VL 58 <br /> COMPATIBILITY <br /> WITH 100% 3 <br /> METHANOL <br /> 4 <br />