Laserfiche WebLink
13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic. <br /> B. Holiday test required immediately before "setting" tank(s) (35,000 - <br /> 40,000 volts). [Section 2635 (b) (4)] <br /> C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br /> (1) Striker plate dimensions and materials. <br /> (2) Striker plate under all accessible openings. <br /> (3) Installation instructions require air testing and soaping a. <br /> prior to installation. <br /> V D. Non-clad steel tank [Section 2635 (b)] 1A15TA1A,&0 j q oIS~ �Y <br /> w ES r14W rrn&TU'c <br /> (1) Cathodic protection provided for entire tank,piping and <br /> components (nuts, bolts, washers, etc.). <br /> (2) :,Approved by a corrosion engineer or N.A.C.E. <br /> .technician. <br /> (3) Document stating inspection method and frequency <br /> (minimum'semi-annual inspection requirement). <br /> E. Other types of tanks. <br /> (1) Chemical composition of material stored is provided. <br /> (2) Chemical abstract service number(CAS#) <br /> 14. Overflow protection systems (detail drawing of spill catchment basins)/piping <br /> sump(s) required). [Section 2635 (b) (8)] <br /> A. Spill catchment basin. €x 0 r/d G <br /> Capacity: <br /> Type: <br /> 5 <br />