Laserfiche WebLink
safety procedures. The "buddy" system will be discussed and the course of action to be <br />taken should any injury occur to an employee. some of many rules to be discussed to help <br />prevent injury or accident are: <br />1. Avoid standing on top of the tank surface. It may be slippery or rusty. <br />2. Check for falling objects, slip, and tripping hazards daily. <br />3. Plastic tarp sheeting will be used if necessary around excavated soil. <br />4. Where necessary, the site will be secured and warning signs up. <br />5. Limit exposure time to noisy equipment. <br />6. Keep a safe distance from excavation and heavy equipment. <br />6. Keep a safe distance from excavation and heavy equipment. <br />7. Stay upwind from tank and excavation. <br />8. Avoid tank area or special precaution when venting with water or with air. Paydirt <br />Excavating Co. Inc. will provide hospital route map. <br />9. The emergency number on site is 911. <br />