My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1988
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2300 - Underground Storage Tank Program
>
PR0231636
>
REMOVAL_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2021 1:25:58 PM
Creation date
11/5/2018 2:59:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1988
RECORD_ID
PR0231636
PE
2381
FACILITY_ID
FA0003869
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTION*
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23912001
CURRENT_STATUS
02
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KASSON\23500\PR0231636\REMOVAL 1988.PDF
QuestysFileName
REMOVAL 1988
QuestysRecordDate
6/18/2013 8:00:00 AM
QuestysRecordID
175776
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y 14./ <br />candard Agreement - Continuation Sheet SA No. 3338 <br />Tom's Breaking S Hauling, Inc. W.O. No. 658 <br />July 22, 1987 Page 2 of 4 <br />6. The Contractor shall provide the State with an approved copy of the tank <br />removal application as submitted to the local jurisdiction. <br />7. The Contractor shall also provide the State with a receipt from the firm <br />receiving the tank verifying that the tank has reached its destination <br />in compliance with the tank removal application. <br />8. a. Contractor shall remove, transport and dispose of the underground tank <br />in accordance with all federal, state and local regulations applicable <br />to this project. <br />b. The Contractor shall coordinate all its work with the field representative, <br />Bob Krump (209) 835-4141, and the Project Manager, Michael Werner <br />at (916) 322-6426. <br />c. Contractor shall notify --the appropriate local agency at least 48 hours <br />prior to initiating any work at this facility. <br />d. The Contractor shall comply with all security and other pertinent <br />regulations enforced at the facility. <br />e. Contractor shall obtain plans of the existing underground storage tank <br />if available from the field representative and make open excavations as <br />required to remove the underground storage tank. <br />f. Contractor shall verify all existing utility services in the immediate <br />area prior to the work, and shall be responsible for any damages to these <br />services. <br />g. Contractor shall sawcut, excavate, remove, and dispose offsite the pavement <br />and/or concrete situated above the underground tank prior to the excavation <br />to remove the underground tank. This requirement may be waived by the <br />project manager depending on the conditions of the existing surface. <br />h. The Contractor shall provide a safety plan when the excavation is over <br />5 feet, 0 inches deep. <br />1. All work, including equipment, materials and installation shall conform <br />to California Administrative Code, Title 24, Building Standards <br />(CAC Title 24) and to California Administrative Code, Title 8, Chapter 4, <br />Division of Industrial Safety (DIS). <br />j. The Contractor shall backfill the tank cavity to 90 percent compaction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.