itandard Agreement - Continuation Sheet SA No. 3179 <br />Tom's Breaking and Hauling, Inc. W.O. No. GST 697 <br />May 5, 1987 Page 2 of 3 <br />6. The Contractor shall provide the State with an approved copy of the tank <br />removal application as submitted to the local jurisdiction. <br />7. The Contractor shall also provide the State with a receipt from the firm <br />receiving the tank verifying that the tank has reached its destination <br />in compliance with the tank removal application. <br />8. a. Contractor shall remove, transport and dispose of the underground <br />tank in accordance with all federal, state and local regulations <br />applicable to this project. <br />b. The Contractor shall coordinate all its work with the field <br />representative, Bob Krump (209) 835-4141 (Ext. 4240) and the Project <br />Manager, Hassan Pejuhesh (916) 322-8994. <br />c. Contractor shall notify the appropriate local agency at least 48 hours <br />prior to initiating any work at this facility. <br />d. The Contractor shall comply with all security and other pertinent <br />regulations enforced at the facility. <br />e. Contractor shall obtain plans of the existing underground storage tank <br />if available from the field representative and make open excavations <br />as required to remove the underground storage tank. <br />f. Contractor shall verify all existing utility services in the immediate <br />area prior to the work, and shall be responsible for any damages to <br />these services. <br />g. Contractor shall sawcut, excavate, remove, and dispose offsite the <br />pavement and/or concrete situated above the underground tank prior to <br />the excavation to remove the underground tank. This requirement may <br />be waived by the project manager depending on the conditions of the <br />existing surface. <br />h. The Contractor shall provide a safety plan when the excavation is over <br />5 feet, 0 inches deep. <br />i. All work, including equipment, materials and installation shall <br />conform to California Administrative Code, Title 24, Building <br />Standards (CAC Title 24) and to California Administrative Code, <br />Title 8, Chapter 4, Division of Industrial Safety (DIS). <br />j. The Contractor shall backfill the tank cavity to 90 percent <br />compaction. <br />