Laserfiche WebLink
dtandard Agreement - Continuation Sheet SA No. 3179 <br />Tom's Breaking and Hauling, Inc. W.O. No. GST 697 <br />May 5, 1987 Page 3 of 3 <br />k. The Contractor shall replace or repair disturbed soil surfaces to <br />match their original conditions. <br />Subsidence of the disturbed surface shall be the responsibility of the <br />Contractor and corrective measures shall be made by the Contractor <br />forthwith. <br />1. Damage to existing facilities is the responsibility of the Contractor <br />and corrective measures shall be taken to bring such facility back to <br />its original condition. <br />M. The cost of performing Item No. 8 above shall not exceed $3,599.99. <br />9. Contractor shall remove, transport and dispose of any product remaining <br />in the tank at a cost not to exceed $1,050.00. <br />10. The Contractor shall replace the removed concrete and/or pavement back <br />to it's original condition at a cost not to exceed $350.00. <br />11. a. If required by the local jurisdiction, the Contractor shall take two <br />soil and/or groundwater samples, one from each end of the tank, at <br />elevation of three (3) feet directly below the bottom of the tank. <br />b. The Contractor shall have all samples analyzed by a certified <br />laboratory acceptable to the appropriate local jurisdiction and the <br />Regional Water Quality Control Board for the total petroleum <br />hydrocarbon, benzene, toluene, xylene and total organic lead content. <br />c. Sampling, preservation and analysis shall be done in accordance with <br />the requirements of the appropriate local jurisdiction and the <br />Regional Water Quality Control Board. <br />d. The cost of analysis of such samples is not included in this contract. <br />