Laserfiche WebLink
representative Charlie Hunt stated we would have to submit a plan <br />to address the sampling at this location to Diane Hanson of his <br />department for approval before proceeding. An Environmental <br />Specialist from North Cal Construction met with Diane Hanson and <br />discussed methods to proceed. The following report addresses our <br />work plan for completion of the project based on information <br />received from San Joaquin County Health Department <br />We understand that: <br />*Groundwater occurs at approximately 10-15 feet beneath this <br />site in a shallow aquifer. <br />*The San Joaquin County Health Department expects all free <br />standing liquid to be removed from the excavation. <br />*San Joaquin County Health Department expects excavation of <br />all visual signs of contamination. <br />*San Joaquin County Health Department expects side wall <br />sampling for signs of hydrocarbon contamination. <br />*San Joaquin County Health Department expects the installation <br />of one (1) groundwater monitoring well. <br />3 <br />