Laserfiche WebLink
Page 2 of 3 <br /> I <br /> ---------------- <br /> From: <br /> .._..From: Glenn Owens [mailto:gowens@jonescovey.com] <br /> Sent: Tuesday, March 18, 2014 12:51 PM <br /> To: Raymond von Flue [EH] <br /> Cc: Mike Baumgaertel; Bret Covey; Scott Hancock <br /> Subject: Flying J #618 Ripon Biodiesel Project <br /> Hi Ray, <br /> Thanks for getting back to me regarding the Flying 1 Ripon Biodiesel Project. Per our Conversation; <br /> At our request the drop-tube for the new biodiesel tank will be cut to length and assembled while you are on <br /> Y q p g <br /> site. <br /> A 5 gallon spill bucket test is required prior to dropping product into the new biodiesel tank. <br /> All tank top equipment including man-way covers, drop-tube, and spill buckets will be installed prior to the tank <br /> ELD testing. <br /> Once the final ELD test is performed and passed on the new biodiesel tank and the Veeder-Root sensors are on <br /> line (sump and annular), permission will be given from San Joaquin County Environmental Health to drop <br /> biodiesel into the new tank. (ELD testing is scheduled forThursday the 20th at 7.00om.)This will conclude the <br /> required ELD testing for this project. <br /> The project is moving forward with the existing trunk line connections into the new transition sumps.This will <br /> include cutting the primary and secondary piping and connecting it to the transition piping.A witnessed Primary <br /> &Secondary test will be performed on the product piping prior to bringing this portion of the system back on <br /> line through the bypass piping.Today(3/18/14)the T-1 Diesel tank trunk line is being tied into the new <br /> transition sump.Tomorrow(3/19/14)the T-2 Diesel tank trunk line will be tied into the new transition sump. <br /> Thursday(3/20/14) the T-3 Diesel tank trunk line will be tied into the new transition sump. <br /> After the biodiesel has been dropped and the trunk line connections have been made,the biodiesel system may <br /> be started up, calibrated, and brought on line. <br /> Within approximately a week of placing the system on line a; line test, monitor certification, and final inspection <br /> will be scheduled, performed, and the project completed. <br /> Please review and comment. <br /> Glenn Owens <br /> fats E%COV@Y tltoup,lot; <br /> Office (888) 972-7581 <br /> Fax (909) 484-0300 <br /> 3/21/2014 <br />