Laserfiche WebLink
i <br /> Please review my approval letter for any other conditions that I missed. Thanks for all of your help. <br /> Raymond von Flue <br /> Lead Sr. REHS, CUPA Programs <br /> San Joaquin County <br /> Environmental Health Dept. <br /> 1868 E. Hazelton Ave. <br /> Stockton, CA 95205-6232 <br /> (209)468-9848 <br /> From: Glenn Owens [mailto:gowens@jonescovey.com] <br /> Sent: Tuesday, March 18, 2014 12:51 PM <br /> To: Raymond von Flue [EH] <br /> Cc: Mike Baumgaertel; Bret Covey; Scott Hancock <br /> Subject: Flying 1x`#618 Ripon Biodiesel Project <br /> Hi Ray, <br /> Thanks for getting back to me regarding the Flying J Ripon Biodiesel Project. Per our Conversation; <br /> At your request the drop-tube for the new biodiesel tank will be cut to length and assembled while you are on site. ` <br /> f <br /> A 5 gallon spill bucket test is required prior to dropping product into the new biodiesel tank. <br /> All tank top equipment including man-way covers, drop-tube, and spill buckets will be installed prior to the tank ELD <br /> testing. <br /> Once the final ELD test is performed and passed on the new biodiesel tank and the Veeder-Root sensors are on line <br /> (sump and annular), permission will be given from San Joaquin County Environmental Health to drop biodiesel into the <br /> new tank. (ELD testing is scheduled for Thursday the 20th at 7:00am.)This will conclude the required ELD testing for <br /> this project. <br /> The project is moving forward with the existing trunk line connections into the new transition sumps.This will include <br /> cutting the primary and secondary piping and connecting it to the transition piping. A witnessed Primary& Secondary <br /> test will be performed on the product piping prior to bringing this portion of the system back on line through the bypass <br /> piping.Today(3/18/14)the T-1 Diesel tank trunk line is being tied into the new transition sump. Tomorrow(3/19/14) <br /> the T-2 Diesel tank trunk line will be tied into the new transition sump.Thursday(3/20/14)the T-3 Diesel tank trunk line <br /> will be tied into the new transition sump. <br /> After the biodiesel has been dropped and the trunk line connections have been made,the biodiesel system may be <br /> started up, calibrated, and brought on line. r <br /> i <br /> Within approximately a week of placing the system on line a; line test, monitor certification, and final inspection will be <br /> scheduled, performed, and the project completed. <br /> Please review and comment. <br /> z <br />