My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DO=NOT E Y I T o C ILL, UT <br /> YWHERE ON THE F-SERIES FITTING <br /> Electrical Conduit pipeInstallation <br /> STEP C1) Only PVC-Coated ROBROYTm Brand conduit (for F-1X-RR fittings) <br /> or standard hot-dip galvanized conduit (for F-1X-SS fittings) are allowed in this <br /> installation. Slide your Bravo Boot over the conduit on the OUTSIDE of the sump. <br /> STEP C2) Dry fit your conduit and mark a line along the pipe (Fig. C2) where it <br /> meets the edge of the F-Series fitting on the outside of the sump. <br /> Fig. C2 <br /> Mark Only ROBROYTM Brand PVC- <br /> Coated '(F-1 X-RR) or any brand <br /> here hot-dip galvanized conduit (F-1X- <br /> SS) is allowed and Warranted <br /> with Bravo Systems F-Series <br /> DoubleWall Electrical Fitting <br /> 1/2" <br /> 7" <br /> LIGHTLY <br /> Hand Sand <br /> this portion <br /> with 80 Grit <br /> MERMFDO NOT INJECT ADHESIVE YET <br /> STEP C3) From your mark line, you must lightly sand your conduit a Half Inch (1/2°) away from <br /> the fitting and Seven Inches (7") towards the fitting, 360° around. Fig. C2. <br /> You must then blow the area with compressed air and clean with acetone using clean rags. <br /> 8 ii-F-Series-1 X-SS-D-11 A <br />
The URL can be used to link to this page
Your browser does not support the video tag.