My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B.5) The main fitting body (Item A) should be installed to ' t�erstitial Test Port <br /> the outside first. Then apply adhesive as shown (Fig. 135).� ( my on Flange) <br /> . A _ r ` <br /> - / Adhesive` <br /> Injection <br /> The Adhesive Injection Port on the fitting body / Port <br /> must be at the 12-o-Clock or North Position. i <br /> The Interstitial Test Port on the Flange <br /> must be at 12-o-Clock or North Position. (Fig X) <br /> Fig. B5 Fig B8 <br /> Adhesive Fill & <br /> Bead <br /> Here <br /> 360° <br /> Item B <br /> Item A (Flange) <br /> (Main bodt <br /> ri <br /> Adhesive <br /> OUTSIDE <br /> Install Main body to outside of sump Install the loose Flange <br /> and apply adhesive to areas shown and use gloved finger to run a <br /> generous bead along joint. <br /> B.6) Apply adhesive to the Main Body's outer surface 360° where shown. Fig. B7 <br /> After applying adhesive to all contact areas (Fig. 135)Apply the flange over <br /> the fitting and to the wall (Item B, Fig. 13.5) <br /> B.7) Apply the Bravo Clamp immediately as shown in Fig. 137. Install clamp e`, t <br /> shown to the body roughly 1/4" from the face and tighten. Then hand-tighten ' <br /> each bolt so it is snug.Apply a 1/4 - 1/2 turn to each bolt evenly until the a - <br /> clamp starts to slide away from the wall and flush with the face of the.fitting. :LAMP <br /> INSIDE <br /> B.8) Apply a generous bead of adhesive as shown. (Fig. B8). <br /> B.9) Glue all penetration fittings and allow to cure following the <br /> pipe manufacturers adhesive instructions. <br /> 7 ii-F-Series-1 X-SS-D-11 A <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.