My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Juing Altet'native to Recommendation <br /> C.1) Your primary pipe, secondary pipe, and Bravo FRP rigid penetration fittings should be clean_ <br /> and COMPLETELY DRY AT ALL TIMES. All pre-abraded or milled areas should be inspected for <br /> debris and inconsistencies. No dirt, grit, water or other foreign material should be on or inside the <br /> fiberglass fitting components. <br /> I <br /> USE SMITH TM ADHESIVEION SMITH TM PIPE or <br /> AMERONTM ADHESIVE ON AMERONTM PIPE ONLY <br /> C.2) Please follow your pipe manufacturers' installation guidelines on cleaning, cutting, scarfing, <br /> tapering and gluing your fiberglass pipe. Clean all parts after scarfing and tapering. <br /> C.3) Get one clamping tool ready for each fitting installation. <br /> CA) Follow your adhesive manufacturer Adhesive <br /> Instructions to mix and apply your adhe- Fig. C5 <br /> sive. One bag of provided fiberglass filler is to <br /> be fully mixed with each adhesive kit. (Pg. 3) <br /> Awl- <br /> DO NOT ATTEMPT TO MIX MORE <br /> THAN ONE KIT AT A TIME. <br /> C.5) Main body first - carefully apply a <br /> generous amount of adhesive to the wall and <br /> the face that will meet the wall (Fig. C5). <br /> DO NOT ALLOW ADHESIVE TO <br /> FILL THE CHANNEL OR TEST <br /> PORT AREA <br /> OUTSIDE <br /> ONLY <br /> ----- -- ------ ---- - /� L <br /> / Carefully apply mixed i <br /> ij adhesive to the flange r �� <br /> 9 ii-F-Series-TS-D-13A <br />
The URL can be used to link to this page
Your browser does not support the video tag.