My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- DO NOT ALLOW ADHESIVE TO FILL THE <br /> 'IIS CHANNEL OR TEST PORT AREA <br /> ONLY I, <br /> ONLY <br /> / Carefully apply mixedFIREN <br /> adhesive to the flange <br /> B.7) The Flange (Item B) should be installed to the inside of the sumpafter adhesive has been <br /> applied as shown. (Fig. 137) NOTE THE ORIENTATION <br /> OF THE INJECTION AND TEST PORT. (Fig. X) / erstitial Test Port <br /> Only on Flange) <br /> Adhesive <br /> The Adhesive Injection Port on the fitting body ' Injection <br /> must be at the 12-o-Clock or North Position, <br /> Port <br /> towards the top of sump (opening). (Fig. X) <br /> (Fig. X) . <br /> The Interstitial Test Port on the Flange / /j Secondary <br /> must be at 12-o-Clock or North Position; � �%��� ,��/f, Pipe <br /> towards the top of sum o g. ) ,% /� Test Pt <br /> P (opening). (Fig. X <br /> (DOUBLE WALL SUMPS ONLY) (Only o <br /> Main body) <br /> i <br /> Fig. B7 FB <br /> Item B <br /> i <br /> (Flange) <br /> Fill & _ <br /> Bead <br /> Here <br /> 360° <br /> Adhesive Adhesive <br /> Item A <br /> (Main' body) <br /> OUTSIDE OUTSIDE <br /> OF SUMP OF SUMP <br /> ) Bead the adhesive 3600 around the fitting edge where it meets the sump wall (Fig. 138). <br /> Then again allow to cure following the pipe manufacturers adhesive instructions. SKIP TO STEP D. <br /> 8 ii-F-Series-TS-D-13A <br /> r; <br />
The URL can be used to link to this page
Your browser does not support the video tag.