Laserfiche WebLink
LEAD DETECTION <br /> 4. <br /> 1i ,S 0 1, 0 C I `s: sl:( <br /> Exclusive Providers for MDleak® and PHDleakO Technologies <br /> 1400Fast Paseo Pa on • Tucson, AI 857 IS ° Phone 835-255-5325 FAX: 520.990.8965 <br /> Sales @ Leald3etect.net • NNrn--1.1.eakDctecr_net <br /> Systems: <br /> 1. LDT has no restrictions to the MDleak® Method. <br /> 2. LDT has several chemical markers so site contamination by a single chemical marker is not a <br /> consideration or limitation. <br /> 3. It is best for the contactor to find the majority of the leaks using whatever method they can. <br /> Small leaks are best left to LDT crews to pinpoint and repaired then for the contractor to <br /> spend hours looking for these little leaks. <br /> 4. Fast identification and leak location substantially reduces repair cost. <br /> General: <br /> 1. Extraction plugs should be installed and sealed properly <br /> 2. A construction crew shall be onsite during the test period. This crew should be equipped to <br /> repair any portion of the system. <br /> 3. The MDleak® method can test piping containing liquids. However if a liquid is present <br /> additional time and cost will be incurred. <br /> Product Piping: <br /> 1. The contractor shall have all shear valves plug or capped using steel not plastic fittings and <br /> connected to the piping. <br /> 2. It is best to complete the turbine connections before the Pretest. Locating and repairing <br /> fittings within the tank sumps during the pretesting is more efficient and less confining than <br /> during the final ELD testing. <br /> Secondary Piping and Connection: <br /> 1. MDleaksM does not require special fittings to be installed by the contractor. <br /> 2. The contractor should use standard California approved factory secondary termination fittings <br /> or boots. Termination fittings in California require test ports. Test ports shall be accessible to <br /> the LDT Technician. <br /> Vent Piping: <br /> 1. Extraction plugs should be installed and sealed properly <br /> 2. Vent risers should be caped and should include test ports on each vent riser <br /> VR Piping: <br /> 1. Extraction plugs should be installed and sealed properly <br /> 2. VR piping at the UDC should also be caped or plug using steel not plastic fittings. <br /> lolhor David Rabb 2of 2 <br /> i <br />