My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flying J Travel Plaza, 1501 N. Jack Tone Rd., Ripon CA <br /> SR0068444 <br /> Additionally, <br /> Each person installing or testing any component must hold a certificate of training from the <br /> manufacturer of that component. <br /> 4. The UST system must be compatible with the substance being stored, California Code of Regulations <br /> (CCR), Title 23, Section 2631.1. <br /> 5. All piping, fittings, sumps, and tanks must be certified by an independent testing organization and <br /> labeled as required by the organization. (UL, ULC, ANSI, API, ASTM, etc. See Title 23 Chapter 16 <br /> Table B for complete list.) Pursuant to Underwriters Laboratories Inc(UL) listing requirements, only <br /> those products bearing the UL mark will be considered listed. ANY PART/PRODUCT NOT MARKED <br /> WITH THE UL LABEL OR ANOTHER LISTED TESTING ORGANIZATION WILL BE REJECTED. <br /> 6. All monitoring systems shall be listed in the CA State Water Resources Control Board (SWRCB) Local <br /> Guidance (LG) 113 letter. <br /> 7. All installation and testing shall be in compliance with manufacturer's instructions, CCR Title 23, <br /> Section 2635 and Section 2636. <br /> 8. All piping must slope to a containment sump with an audible/visual alarm. <br /> 9. UST sumps must be constructed "product tight" as defined by California Health and Safety Code <br /> (HSC) Section 25290.1. <br /> 10. All tank top openings that are connected to the primary space of the UST must have secondary <br /> containment, audible/visual alarm and be product tight or terminate at grade. <br /> 11. All secondary containment for the UST must be constructed per HSC Section 25290.1(c)(3). <br /> 12. The secondary containment system for the UST must be continuously monitored as required under <br /> HSC Section 25290.1 <br /> 13. Overfill prevention for the UST shall satisfy CCR Section 2635(b)(2)(A) pursuant to the permit <br /> application. <br /> 14. All UST metal components in direct contact with the ground such as flexible connectors, swing joints, <br /> fittings, clamps, bands, and pumps shall have corrosion protection. <br /> 15. On Sheet PP3, diagram 1, top view, illustrates a 2" LCX coaxial fiberglass siphon line extending to the <br /> diesel tank, for future use,which will be capped off inside the sump. If installed, this siphon line shall <br /> be constructed "product tight" and monitored as referenced in conditions 9 & 12 respectively. <br /> 16. Any changes in the approved scope of work shall be submitted to the EHD for approval prior to <br /> commencing work. All new submittals supersede the previous ones. <br /> 17. A"Certification of Installation /Modification"form for each tank shall be submitted by the owner or the <br /> owners' agent[pursuant to CCR Section 2635(d)] before this install will be considered complete by the <br /> EHD. <br /> 18. An accurate and drawn to scale as-built plan must be submitted to the EHD prior to scheduling a final <br /> inspection. <br /> 19. Passing Enhanced Leak Detection (ELD) results for the UST must be received by the EHD prior to <br /> depositing product into the UST. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.