Laserfiche WebLink
system(if used)and geotextile fabric(if used).See SECTIONS f <br /> Air-test Monitoring of Secondary Tank 7.2., 7.3.and 7.4. <br /> (dry interstHial space) <br /> ;• 5.2.4.2.When preparing the excavation,allow for the appropri- <br /> ate depth of cover as specified in SECTION 7.4. <br /> 5.2.4.3. If two or more tanks are to be installed in the same ex- <br /> cavation hole,follow instructions in SECTION 7.5. !' <br /> i <br /> FIGURE 4-4 5.2.4.4.If the tank has a bottom sump or fitting,prepare the <br /> 4.5.7.Soap the entire exterior of the tank.See SECTION 3.7. excavation hole according to instructions in SECTION 10. <br /> 4.5.8. Hold and monitor the pressure for a minimum of 1 hour. 5.2.5. Remove all loose material from the excavation. <br /> 4.5.9.Carefully release the air pressure from the tank.See 5.2.6.Where necessary, level the bottom of the excavation <br /> SECTION 3.9. using primary backfill material,filling in any low areas.See <br /> SECTION 6 for backfill requirements. <br /> 4.5.10. Remove the test manifolds and replace the protective <br /> covers in the service fittings. 5.2.7. If an anchor slab is needed, install it now.See POINT <br /> 7.5.3.3. and SECTION 8.6. <br /> 5. INSTALLING TANKS 5.2.8. If geotextile fabric is to be used, place it in the excava- <br /> ® WARNING tion hole at this time.See SECTION 9. <br /> 52.8.1.Geotextile must be placed to separate the primary <br /> If product is used as ballast,exercise special care in han- <br /> dling. backfill material from all other in situ soil and/or secondary <br /> Safeguard against sparks,fire or product spills.Im- <br /> proper handling of product could cause a fire or explosion backfill material. <br /> and could result in death or serious injury. 5.2.9. If deadmen are used,see SECTION 8 for information on <br /> ® WARNING deadmen placement and place them now. <br /> Do not use air pressure to test tanks that contain or have 5.2.9.1. If deadmen are used and they are to be placed so that <br /> contained flammable or combustible liquids or vapors.The they are in the bedding or below the bottom of the tank,place <br /> fuel and air mixture could explode and could result in death the deadmen before preparing the backfill bedding. <br /> or serious injury.Tanks should be air tested before ballast- <br /> ing. See SECTION 12. 5.2.10. Prepare a 12-inch-thick smooth, level bed of approved <br /> primary backfill material on the bottom of the excavation.See <br /> NOTICE SECTION 6 for backfill requirements. <br /> Adequately ballast the tank(add liquid)in a wet hole or in a NOTICE <br /> dry hole that may become wet(for example,from site runoff) <br /> until the installation is totally completed.Failure to do this If anchor straps are used, bedding must be carefully leveled. <br /> may result in damage to the tank and/or surrounding property. Failure to follow this notice may result in straps being too <br /> 5.1. GENERAL short or too long,and may result in property damage. <br /> 5.1.1.Take safety precautions throughout the entire installation 5.2.10.1. If the excavation has soft soil conditions or if there <br /> process.See SECTIONS 1.1.and 7.1. might be difficulties controlling water accumulation, it is ac- <br /> ceptable to increase the bedding thickness to 18 inches and <br /> 5.1.2. Use only approved backfill material.See SECTION 6. set the tank anchors 6 inches off the bottom of the excavation <br /> 5.1.3. Do not mix approved material together with sand or in (9 inches for 10-foot-diameter tank deadmen). <br /> situ soil. 5.2.11.See SECTION 2 regarding the use of lifting lugs to <br /> 5.1.4. Do not use in situ soil as primary backfill material. hoist the tank when unloading and installing it. <br /> 5.1.5.Typically, all excavated in situ soil must be replaced with 5.2.12. Place the tank or tanks onto the bed, <br /> primary backfill material. 5.2.12.1.If deadmen are in place,center the tanks between them. <br /> 5.2. DRY-HOLE INSTALLATION NOTICE <br /> 5.2.1. Before beginning tank installation,take a tank diameter <br /> measurement.See SECTION 11 for instructions. Do not set tanks directly onto a concrete slab,timbers, <br /> cradles or in situ soil. Failure to follow this notice may result <br /> 5.2.2. Record this measurement as Measurement 41 on the in damage to the tank. <br /> Tank Installation Checklist. 5.2.12.2.Align the tanks with anchors for proper placement of <br /> 5.2.3. Locate the excavation site according to instructions in anchor straps. <br /> SECTIONS 7.1.and 7.2. 5.2.12.3.As the tank is being placed,slope the tank according <br /> 5.2.4. Prepare the excavation according to instructions in to site specifications. '.. <br /> SECTION 7. NOTE:Xerxes does not require that a tank be sloped.The <br /> 5.2.4.1.When preparing the excavation,allow for an anchoring slope is determined by the tank owner's specifications. <br /> 8 <br />