Laserfiche WebLink
r <br /> preinstallation testing procedures.The date that the vacuum 4.4.9. Remove the test manifold and replace the protective G, <br /> was applied is on a label by the monitor or on the shipping covers in the service fittings. L <br /> documentation delivered with the tank. 4.5.AIRTESTING A DRY-MONITOR, DOUBLE-WALL <br /> 4.3.1.1.This date may be used as a reference under this pro- MULTICOMPARTMENTTANK NOT UNDER VACUUM <br /> cedure to evaluate the tank's integrity prior to installation,and _ <br /> to validate Xerxes'obligations under the limited warranty. NOTICE <br /> 4.3.1.2.Xerxes tanks shipped under vacuum must be under Do not connect air supply directly to the interstitial-space <br /> monitoring access fitting.Pressurizing the interstitial space <br /> vacuum for a minimum of 7 days. If this requirement is not met, <br /> by itself may result in damage to the primary tank and/or <br /> an air/soap test is required.See SECTION 4.4.for instructions. tank failure. <br /> 4.3.1.3.The tank shipped under vacuum should be installed 4.5.1. Prepare the tank for air testing.See SECTION 3.4. <br /> and backfilled with the vacuum intact if both of the following _ <br /> two conditions are met: 4.5.1.1.Install a test manifold in each compartment,that is,in <br /> the base tank and each end compartment.See FIGURE4-1. - <br /> 4.3.1.3.1. installation of the tank is to begin 7 days or more <br /> afterthe factory application of vacuum(as indicated on the <br /> shipping documents and/or tank labels) Typical Lifting <br /> Optional reservoir man ay lug Typical Monitoring access - <br /> 4.3.1.3.2,the vacuum gauge shipped with the tank reads 12 (wet interstitial space) With fittings service fitting ftfing(dry <br /> 9 9 PP \ � interstitial space) <br /> inches of mercury or more. Pressure- <br /> relief valve <br /> NOTE:Under certain field conditions(such as major for shipping <br /> changes in temperature,barometric pressure and/or alti- End Base tank End <br /> Compartment Compartment <br /> tude)and/or with certain equipment failure(such as freezing <br /> or sticking of gauge mechanism),the vacuum-monitoring / \ Flat <br /> method may not be an accurate enough test.When in j <br /> Seam for base tank <br /> doubt,or when such conditions occur,Xerxes recommends seam for end compartment Seam for end compartment <br /> SECTION 4.4. or 4.5.(whichever is applicable)as the pre- <br /> ferred preinstallation test procedure. <br /> FIGURE 4-1 <br /> 4.3.1.4.After the tank is backfilled to the top of the tank,the 4.5.2. Pressurize the primary tank of the base tank.See SEC- <br /> tank must be air tested.See SECTION 13 for instructions. TION 3.5 and FIGURE 4-2. <br /> 4.3.1.5. If either or both of the conditions stated in POINTS <br /> 4.3.1.3.1. and 4.3.1.3.2. are not met,follow the procedures of Air Test of Primary Tank <br /> SECTION 4.4. or 4.5. (whichever is applicable)for the prein- <br /> stallation test. <br /> 4.3.1.5.1. If the gauge reads less than 12 inches of mercury, <br /> perform a visual inspection of the exterior of the tank and the <br /> vacuum gauge fittings to evaluate the tank's integrity,and <br /> contact the plant from which the tank was shipped. <br /> FIGURE 4-2 <br /> NOTE: Do not attempt unauthorized repairs. 4.5.3. Pressurize the end compartment(s).See SECTION 3.5. <br /> 4.3.1.6. Record the vacuum gauge reading at the time of in- and FIGURE 4-3. <br /> stallation on the Tank Installation Checklist. <br /> 4.4.AIRTESTINGADRY-MONITDR,DOUBLE-WALLTANK Air Test of End Compartment(s) <br /> 4.4.1.Prepare the tank for air testing.See SECTION 3.4, y <br /> 4.4.2. Pressurize the primary tank.See SECTION 3.5. <br /> 4.4.3.Soap all service fittings and manways.See SECTION 3.7. <br /> 4.4.4.Hold and monitor the pressure in the primary tank for a <br /> minimum of 1 hour. FIGURE 4-3 <br /> 4.4.5. Use the quick disconnect assembly to pressurize the in- 4.5.4.Soap all service fittings, manways and covers.See <br /> terstitial space.See SECTION 3.6. SECTION 3.7. <br /> 4.4.6.Soap the entire exterior of the tank.See SECTION 3.7. 4.5.5. Hold and monitor the pressure for a minimum of 1 hour. <br /> 4.4.7. Hold and monitor the pressure in the interstitial space 4.5.6.Use the quick-disconnect assembly to pressurize the in- <br /> for a minimum of 1 hour. terstitial space.See SECTION 3.6.and FIGURE 4-4. <br /> 4.4.8.Carefully release the air pressure from the tank.See <br /> SECTION 3.9. <br /> 7 <br />