My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.8.1.4.Lower each deadman to the bottom of the excavation <br /> using the wire rope. <br /> 8.8.1.5.Center each anchor strap on each location marked <br /> with an arrowhead symbol 10-4. - <br /> 8.8.1.6.Bring the live end of each wire rope up to the top of = <br /> the tank at each marked location. <br /> 8.8.1.7.Take the slack out of each wire rope and splice the <br /> termination of the wire ropes on top of the tank. <br /> 9. GEOTEXTILE FABRIC <br /> 9.1. GENERAL <br /> 9.1.1. Geotextile fabric allows the passage of water in and out - <br /> of the excavation but prevents the migration and mixing of in ^�=•^^Pln ° t?'�°°;`t�. - <br /> situ soil and the select backfill material.Geotextile helps pre- <br /> serve the integrity of the select backfill envelope that sur- _ <br /> rounds and supports the tank. <br /> 9.1.2.The tank owner or the owner's technical representative <br /> is responsible for determining whether a geotextile or an alter- <br /> nate filtering technique is appropriate for a specific installation. FIGURE 10-1 <br /> 9.1.3. Using geotextile fabric is considered good installation 10.1.4.The required 12 inches of backfill bedding on the bottom <br /> practice and Xerxes recommends using it in any installation,but of the excavation must also be present in the excavation hole in <br /> especially when the tank is installed in the following conditions: which the sump or fitting will be placed.See FIGURE 10-2. <br /> 9.1.3.1.areas with frequently changing groundwater condi- <br /> tions or areas subject to tidal fluctuations <br /> i <br /> 9.1.3.2. unstable soils,such as those cited in SECTION 7.5.3. <br /> 9.1.3.3.water conditions with silty in situ soil. <br /> 9.1.4. For further information concerning geotextile specifica- <br /> tions and installation procedures,consult the geotextile sup- <br /> plier's installation guidelines or instructions. <br /> 9.1.5. Polyethylene film is not considered an effective geotex- <br /> tile material because it may tear or degrade while in service. <br /> 9.1.6. If geotextile is used,the bedding material is to be <br /> placed on top of geotextile. _•�•° �•;+„c ;;�, f.ats'3,7_;c�:_,,. <br /> 10. BOTTOM SUMPS AND FITTINGS <br /> 10.1. GENERAL <br /> 10.1.1.When handling a tank with a bottom sump or fitting,al- <br /> ways take extra care so that the bottom sump or fitting is not <br /> damaged by contact with any other object,such as the truck FIGURE 10-2 <br /> bed or the ground. 10.1.5.After setting the tank,fill and tamp the space around <br /> the sump or fitting by using hand tools before continuing the <br /> 10.1.2.When installing a large bottom sump in a water or backfilling. <br /> wastewater tank,see the Xerxes supplement, Large Bottom <br /> Sump Installation Instructions. See SECTION 20 for details on 11. TAKING DIAMETER MEASUREMENTS <br /> where to obtain this supplement. 11.1. GENERAL <br /> NOTICE 11.1.1.Diameter measurements must be taken at various <br /> stages of the installation process to verify that the process is <br /> All connections to the tank must be flexible. Provisions must proceeding correctly. <br /> be made to accommodate movement and misalignment be- <br /> tween the piping and the tank.Failure to do this may result 11,1,1.1. It is important that these measurements are taken <br /> in damage to the tank and/or surrounding property. and,if needed,appropriate action is taken so that tank deflec- <br /> 10.1.3.While preparing the backfill bedding,dig a hole in the tion is within allowable limits. <br /> bottom of the excavation that is large enough to accommo- <br /> date the sump or fitting.See FIGURE 10-1. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.