My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii <br /> 8.5.2. For placement of Xerxes prefabricated deadmen,see <br /> FIGURE 8-1 or 8-2(whichever is applicable)and the Xerxes <br /> supplement, Prefabricated deadmen Installation Instructions. <br /> Anchor point <br /> 8.5.3.Xerxes prefabricated deadmen are supplied with 3/4- <br /> inch-diameter,galvanized, adjustable anchor points.These <br /> ------- ----- ------- <br /> anchor points protrude up through the slats in the deadmen <br /> 12"bedding material 15" <br /> and are held up with temporary supports. M <br /> WARNING <br /> Only use the anchor points when lifting and positioning the Concrete slab <br /> deadmen.A spreader bar may be required to lift longer sec- <br /> tions of deadmen. Use guide ropes to guide the deadmen <br /> when lifting. Failure to do so could result in death or serious <br /> injury. <br /> FIGURE 8-7 <br /> 8.5.4. Use one anchor point per strap end and only one strap <br /> per anchor point. 8.7, MAN-OUT-OF-HOLE (MOH) STRAPS <br /> 8.5.5.The anchor points can be moved and positioned to 8.7.1.The Xerxes man-out-of-hole(MOH)strap system is de- <br /> match the anchor strap locations marked by arrowhead sym- signed for use in installations where water is in the excavation <br /> bols lb-1 on the tank rib(on the tank itself for 4-foot-diameter and/or where personnel may not enter the tank hole. <br /> tanks). <br /> 8.7.1.1.This strap system can be, but need not be,used in <br /> 8.5.6.When using these deadmen in man-out-of-hole strap conjunction with Xerxes deadmen. <br /> applications, align the anchor points with the proper ribs be- <br /> fore setting them in the hole. 8.7.2.When using the MOH strap system,the placement of <br /> components is critical.See the Xerxes supplement, Man-Out- <br /> 8.5.7. Keep backfill from entering the anchor-point slot until of-Hole(MOH)Straps Instructions. <br /> final adjustment is made. <br /> 8.8.ALTERNATE WET-HOLE ANCHORING METHOD <br /> 8.5.8.The deadmen are to be butted together when multiple 8.8.1. In wet-hole installations,when Xerxes' preferred rnan- <br /> seeticns are used. out-ot-hale anchoring method is not available or possible,the <br /> 8.6. ANCHOR SLABS following method may be used: <br /> 8.6.1.An anchor slab is a reinforced concrete base and should 8.8.1.1. Place the anchor strap between the wire rope and the <br /> be designed according to the applicable American Concrete tank so that the wire rope is never in direct contact with the tank. <br /> Institute. <br /> 8.8.1.1.1.The H-shaped positioning clips around the strap are <br /> •a <br /> 8.6.2.The total length of the slab must be at least the same as designed to accommodate the wire rope on top of the strap as <br /> the length of the tank. shown in FIGURE 8-8. <br /> 8.6.3.The minimum slab thickness is 8 inches. <br /> 8.6.4.The width of the slab depends on the tank diameter.The <br /> slab must extend a minimum of 18 inches(12 inches for 4- <br /> foot-diameter tanks) beyond each side of the tank. <br /> 8.6.5. Provide a separate anchor point for each anchor strap. <br /> 8.6.6.All anchor points must be engineered to withstand the <br /> tank's buoyancy forces. <br /> 8.6.7.Refer to FIGURE 8-7 for anchor-point height.Refer-to a <br /> TABLE 8-1 or TABLE 8-2 for other anchor-point dimensions. uF� <br /> a, c� <br /> 8.6.8.When using a concrete anchor slab,allow sufficient d;a, d.y tri <br /> depth in the excavation for 12 inches of bedding material be- <br /> tween the tank and the anchor slab.See FIGURE 8-7. <br /> 8.6.9.Anchor points must extend 3 inches above the bedding. <br /> With a 12-inch bedding,the anchor point is 15 inches above <br />{ the slab. FIGURE 8-8 <br /> i - <br />?. NOTE:If a turnbuckle is used with a 4-foot-diameter tank,the 8.8.1.2• Loop a wire rope around the deadman at each rib <br /> l anchor point must be 3 inches below the top of the bedding. marked with an arrowhead symbol ►al(at each marked loca- <br /> tion on 4-foot-diameter tanks), <br /> y8.8.1.3. Secure the termination of the wire rope. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.