My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4.2.The bottom of the anchor points must be 15 inches above the 2.5.2.Clean debris from the top of the tank rib marked with the <br /> top of the slab and positioned the distance from the tank centerline arrowhead symbols ®®. <br /> that is shown in TABLE 2-1 2.5.3.Lift the strap with the hook end down and the hook facing <br /> Note:The straps provided will not work unless the proper ele- away from the tank.(See FIGURE 2-4.) <br /> vation for anchorp oints is maintained. <br /> Galvanl,ed&ap- Alurnl= Galvanad <br /> end connre r�stsapguide emphook� <br /> Nominal Tank Diameter Nominal distance between <br /> tank centerline and anchor <br /> point(and tolerance) <br /> 8' 55"(±3 inches) MOHstrap <br /> 10' <br /> 72" ±3 inches �J <br /> TABLE 2-1 FIGURE 2-4 <br /> t t between the tank and the <br /> 2.5.4.Lower he hook end of he strap be ee <br /> 2.4.3.Place 12 inches of level backfill over the slab. anchor point,and hook the strap to the anchor point. <br /> 2.4.4.When setting the tank,make sure that the marked arrowhead 2.5.5.On one end of the threaded rod,put a washer and a blind nut <br /> symbols►®on the tank are aligned with the anchor points on the (acorn nut). <br /> anchor slab. 2.5.6.Feed the rod through the hole in the strap-end connector. (See <br /> FIGURE 2-5.) <br /> 2.5.Installing Man-Out-Of-Hole Straps <br /> 2.5.1. Each load binder assembly consist of the items shown in 2.5.7.On the other end of the threaded rad,put a washer and a nut. <br /> FIGURE 2-3 and TABLE 2-2. 2.5.8.Center the wear plate on the top center line of the marked ribs. <br /> 2.5.9.Lower the threaded rod,washer and nut into the channel section <br /> on the strap-end connector,taking care to place the washer and nut on <br /> 5\3 s 4 2 1. the outside of the connector.(See FIGURE 2-5.) <br /> 7 2_ 4 3 3\5 I <br /> I <br /> _.._ ._.. _ F431 -. . } Add blind nut and <br /> washer here <br /> Add nut and washer here -- <br /> 6 <br /> Note:The numbers above correlate to item numbers in TABLE 2-2. <br /> FIGURE 2.5 <br /> FIGURE 2.3 2.5.10.Hand-tighten the nuts. <br /> 2.5.11.Repeat POINTS 2.5.5,2.5.6,2.5.7,2.5.9 and 2.5.10 for the <br /> Load Binder Assembly Parts List second rod of the assembly. <br /> 2.5.12.After the two threaded rods are placed,tighten the threaded rods, <br /> Item Quantity Description using a torque wrench to lighten to 25-30 foot-pounds,or until snug. <br /> 2.5.13.Repeat POINTS 2.5.2 to 2.5.12 for each of the load binder <br /> 1 2 MOH Hold-down strap assemblies. <br /> 2 2 - 518"-diameter threaded rod ® CAUTION <br /> 3 4 518"washer When tightening straps,do not cause deflection of more <br /> 4 2 518"nuts than 3/16-inch to the tank diameter. <br /> 2.5.14.Tank deflection should be checked by taking the tank diame- <br /> 5 2 518"blind nuts(acorn nuts) ter before and after tightening straps as explained in the Deflection <br /> 6 1 1 Wear plate Measurement Section of the Installation Manual <br /> 2.5.15.All exposed metal on the anchoring system must be coated <br /> TABLE 2-2 with a corrosion-protection material.Previously coated metal that <br /> Note:Some contractors prefer to perforin Points 2.5.5 through 2.5.7 has been damaged must be recoated. <br /> outside the tank excavation before moving the strap to the tank. 25.16.Continue installing the tank according to the Installation Manual. <br />
The URL can be used to link to this page
Your browser does not support the video tag.