Laserfiche WebLink
2.4.2.The bottom of the anchor points must be 15 inches above the 2.5.2.Clean debris from the top of the tank rib marked with the <br /> top of the slab and positioned the distance from the tank centerline arrowhead symbols ®®. <br /> that is shown in TABLE 2-1 2.5.3.Lift the strap with the hook end down and the hook facing <br /> Note:The straps provided will not work unless the proper ele- away from the tank.(See FIGURE 2-4.) <br /> vation for anchorp oints is maintained. <br /> Galvanl,ed&ap- Alurnl= Galvanad <br /> end connre r�stsapguide emphook� <br /> Nominal Tank Diameter Nominal distance between <br /> tank centerline and anchor <br /> point(and tolerance) <br /> 8' 55"(±3 inches) MOHstrap <br /> 10' <br /> 72" ±3 inches �J <br /> TABLE 2-1 FIGURE 2-4 <br /> t t between the tank and the <br /> 2.5.4.Lower he hook end of he strap be ee <br /> 2.4.3.Place 12 inches of level backfill over the slab. anchor point,and hook the strap to the anchor point. <br /> 2.4.4.When setting the tank,make sure that the marked arrowhead 2.5.5.On one end of the threaded rod,put a washer and a blind nut <br /> symbols►®on the tank are aligned with the anchor points on the (acorn nut). <br /> anchor slab. 2.5.6.Feed the rod through the hole in the strap-end connector. (See <br /> FIGURE 2-5.) <br /> 2.5.Installing Man-Out-Of-Hole Straps <br /> 2.5.1. Each load binder assembly consist of the items shown in 2.5.7.On the other end of the threaded rad,put a washer and a nut. <br /> FIGURE 2-3 and TABLE 2-2. 2.5.8.Center the wear plate on the top center line of the marked ribs. <br /> 2.5.9.Lower the threaded rod,washer and nut into the channel section <br /> on the strap-end connector,taking care to place the washer and nut on <br /> 5\3 s 4 2 1. the outside of the connector.(See FIGURE 2-5.) <br /> 7 2_ 4 3 3\5 I <br /> I <br /> _.._ ._.. _ F431 -. . } Add blind nut and <br /> washer here <br /> Add nut and washer here -- <br /> 6 <br /> Note:The numbers above correlate to item numbers in TABLE 2-2. <br /> FIGURE 2.5 <br /> FIGURE 2.3 2.5.10.Hand-tighten the nuts. <br /> 2.5.11.Repeat POINTS 2.5.5,2.5.6,2.5.7,2.5.9 and 2.5.10 for the <br /> Load Binder Assembly Parts List second rod of the assembly. <br /> 2.5.12.After the two threaded rods are placed,tighten the threaded rods, <br /> Item Quantity Description using a torque wrench to lighten to 25-30 foot-pounds,or until snug. <br /> 2.5.13.Repeat POINTS 2.5.2 to 2.5.12 for each of the load binder <br /> 1 2 MOH Hold-down strap assemblies. <br /> 2 2 - 518"-diameter threaded rod ® CAUTION <br /> 3 4 518"washer When tightening straps,do not cause deflection of more <br /> 4 2 518"nuts than 3/16-inch to the tank diameter. <br /> 2.5.14.Tank deflection should be checked by taking the tank diame- <br /> 5 2 518"blind nuts(acorn nuts) ter before and after tightening straps as explained in the Deflection <br /> 6 1 1 Wear plate Measurement Section of the Installation Manual <br /> 2.5.15.All exposed metal on the anchoring system must be coated <br /> TABLE 2-2 with a corrosion-protection material.Previously coated metal that <br /> Note:Some contractors prefer to perforin Points 2.5.5 through 2.5.7 has been damaged must be recoated. <br /> outside the tank excavation before moving the strap to the tank. 25.16.Continue installing the tank according to the Installation Manual. <br />