Laserfiche WebLink
Flying J Travel Plaza #618, 1501 N. Jack Tone Rd., Ripon CA, 95366 —SR0068444 <br /> Will the sensor in the sump shut down the pumps in the injection building when an alarm <br /> is trigged? <br /> Second response received: NEF cutsheet and Affirmative Statement of Compatibility <br /> provided in this submittal. Specified sump sensor is a non-discriminating sensor <br /> programmed for positive shut down when in alarm. Refer to note 14fPP5. <br /> Upon reviewing the cut sheets for the NEF Bio Diesel Equipment Transition Sump, a <br /> model number was not listed. The third party listing information provided from the <br /> manufacturer is not a valid UL file number. The ULC file number for NEF products is <br /> EGV1/7.MH30126. The Bio Diesel Equipment Transition Sump is not listed under this <br /> file number. Provide the model number for the Bio Diesel Equipment Transition Sump <br /> and a valid third party specific file number for the approved listing. What type of <br /> hydrostatic monitoring fluid will be used within the interstitial space of the Bio Diesel <br /> Equipment Transition Sump? <br /> F <br /> 5. A completed Unified Program Consolidated Form (UPCF) for Underground Storage <br /> Tank information was not submitted. <br /> First response received: Form to be submitted with this resubmittal. <br /> The completed form has double walled vent piping transition sump checked. A double <br /> walled vent piping transition sump is not shown on sheet PP1.1. Only a concrete pad <br /> that supports the black iron piping transition below finished grade. <br /> Also the product piping is listed as a pressurized system. How will the biodiesel piping <br /> have a mechanical line leak detector installed? <br /> Second response received: Sump is shown on detail 01fPP1.1. Biodiesel line is k <br /> conventional suction. Form corrected and attached. I <br /> Corrected form was received. <br /> 6. Manufacturers' cut sheets for tanks, piping, and equipment (e.g., monitoring equipment, <br /> overspill containment device, overfill protection device, etc.) were not submitted. Also <br /> include the Affirmative Statement of Compatibility by each manufacturer to ensure that B100 <br /> is compatible with their products. <br /> i <br /> First response received: Cut sheets to be submitted with this resubmittal. <br /> Cut sheets were not submitted for the type of Ameron piping, transition sump in the injection i <br /> building, and the vent transition sump. A cut sheet for a double walled spill container was E <br /> provided and was not the one listed on the proposed installation plans. <br /> y <br /> Second response received: Additional Cut sheets to be submitted with this resubmittal. <br /> Additional cut sheets were received. A single walled spill container will be utilized for the <br /> fill and vapor risers as listed on the plans. <br /> 7. Buoyancy calculations wet signed and stamped by a Professional Engineer were not t <br /> submitted for the UST. I <br /> 4 <br /> r <br />