My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raymond von Flue [EH] <br /> From: Jonathan Smith <JSmith@sbravo.com> - <br /> Sent: Tuesday, December 10, 2013 1022 AM <br /> To: Raymond von Flue [EH] <br /> Subject: RE: Special Application Containment Sump <br /> Attachments: AOC-764-EGVV2,pdf, Bravo_SumpWallConstSpec_2013.pdf, 3RP-B830-Series.pdf ] <br /> Importance: High <br /> Hello Raymond, <br /> Addressing your questions below: <br /> The industry standard that provides the basis for all Bravo containment sump and entry fitting design <br /> specifications is the ANSI/UL standard 1316, found here: <br /> http:lfuIstandardsinfonet.ul.com/scopes/scopes.asp?fn=1316.html. Mr. Mukai was not required to conduct any <br /> testing. <br /> t <br /> F <br /> The above is found on the EGW2 category page: http://database.ul.com/cgi- <br /> bin/XYV/template/LISEXT/1 FRAME/show a e.html?&name=EGW2.GuideInfo&ccnshorttitle=Tank+Accessori <br /> es+for+Flammable+and+Combustible+Liquids+- <br /> +Component&obiid=1073750802&cfgid=1073741824&version=versionless&parent id=1073750801&sequence <br /> =1 <br /> A document that satisfies both EGW2 and UL1316 was listed on line #1 but it was mislabeled. This has been <br /> corrected on the review and the document previously reviewed is attached for your review as A©C-764- <br /> EGW2.pdf <br /> An existing Bravo document regarding sump construction specifications was reformatted and provided for <br /> review, and was added to the engineering review document on line #6, proving our minimum wall thicknesses <br /> exceeds the EGW2 requirement of .1 of an inch. <br /> This is attached as Bravo_SumpWal]ConstSpec_2013.pdf for your review as well. <br /> Regarding dry primary annulus volumes, an additional statement was provided in the engineering review <br /> observing that the requirement to observe the CCR, section 2631(d)(1) is mentioned in the reviewed product <br /> installation manuals. <br /> Both documents attached to this email are listed in the revised engineering approval attached to this email. <br /> F <br /> Please let me know if this revision to the engineering review is satisfactory. <br /> Sincerely, <br /> Jonathan Smith <br /> Director, IT& Brand,Management <br /> Tel: (323) 888-4133 Fax: (323) 888-4123 <br /> ismith(cDsbravo.com www.sbravo.com -tk**dJ <br /> BPAV <br /> 01 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.