My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> From: Raymond von Flue [EH] [mailto:rvonflue_@sjcehd.com] <br /> Sent: Thursday, December 05, 2013 4:38 PM <br /> To: Jonathan Smith <br /> Cc: Kasey Foley [EH]; wng@sjcehd.com; artl@mrbec.com; mikeb@mrbec.com; jerrod.herron@pilottravelcenters.com; <br /> cjohnsonPcore-eng.com <br /> Subject: RE: Special Application Containment Sump <br /> Jonathan, <br /> After reviewing the attachment from Mr. Don K. Mukai,the engineering specification as listed in the section below is <br /> missing the following information: <br /> No mention of the materials used to construct the secondary containment system that will provide sufficient thickness, <br /> density,corrosion resistance to prevent structural weakening or damage to the secondary containment system as a <br /> result of contact with any released hazardous substance. <br /> No mention that the secondary containment will be constructed to contain the listed volumes for the existing dry <br /> annular primary piping containment system at this facility. <br /> i <br /> According to CCR, section 2631.1 (b): For underground storage tank system components installed on or after July 1, <br /> 2004,the applicable approvals required in subsections 2631 (b) and (d) shall include a list of the compatible products F <br /> tested and the measured permeation rates, if such testing is required by the industry code or engineering standard used <br /> to evaluate the component. These results shall be provided to the local agency upon request. <br /> I <br /> Was any testing required to be conducted by Mr. Mukai by industry code or engineering standard to evaluate the <br /> containment sump? If so, please submit these results. <br /> Raymond von Flue <br /> Lead Sr. REHS, CUPA Programs <br /> San Joaquin County <br /> Environmental Health Dept. <br /> 8 <br /> 1865 E. Hazelton Ave. <br /> Stockton, CA 95205-6232 <br /> (209)468-9848 <br /> From: Jonathan Smith [mailto:JSmith@sbravo.com] <br /> Sent: Thursday, December 05, 2013 3:49 PM <br /> To: Raymond von Flue [EH] <br /> Subject: RE: Special Application Containment Sump <br /> Importance: High <br /> Hello Raymond, <br /> Getting back to you regarding the B-830 series sump line. We specialize only in Secondary Containment, with <br /> containment sumps and entry fittings that are not a component of the primary containment system. This <br /> product falls under the provision found at CCR Title 23, Article 3, section 2031(d), which states: <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.