Laserfiche WebLink
0 '/' <br /> UNIFIED PROGRAM STORAGE T,"NFORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page I of 2) <br /> TYPEOFACTION -XLNEWPLAN ❑ 2.CHANGE OF INFORMATION 49x1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. <br /> (Check one item only) R 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(SI. A <br /> FACILITY[D#(Agency Use OnI. FACILITY INFORMATIONly) _ 1 <br /> BUSINESS NAME(Same as FACILITY NAME) 0 - Lp 3 <br /> BUSINESS SITE ADDRESS �l �-•r�` c� 103 <br /> V CITY x lox. <br /> I <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,Probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634,2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 49x3' <br /> 490.36 <br /> III.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490.4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT 4905 <br /> VAULTS)WITH AUDIBLE AND VISUAL ALARM 3 CCR§2632,2634) <br /> SECONDARY CONTAINMENT�[S/:� �❑ a.DRY b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 090' <br /> PANEL MANUFACTURER: 1L-GL 490x. MODEL#: 49 <br /> LEAK SENSOR MANUFACTURER: 490-9. MODEL#(S): ®� 90.1U <br /> 2.AUTOMATIC TANK CADGING(ATC)SYSTEM USED TO MONITOR SINGLE WALL TANKISI.(23 CCR <br /> §Z643) 49041 <br /> PANEL MANUFACTURER: _ J90-12 MODEL p: 49x13 <br /> [N-TANK PROBE MANUFACTURER: 490.10_MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY _ ❑ e.OT_HER(Specify)_ 490.11 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 49°18 <br /> 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTC)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490-u <br /> S.TANK INTEGRITY TESTING(23 CCR§2643.1): <br /> TEST FREQUENCY: Ela.ANNUALLY ❑ b.BIENNIALLY 49u 23 <br /> ❑ c.OTHER(Specify): 490-24 <br /> 490¢9 <br /> ❑99.OTHER (Specify): 490-26 <br /> a9azr <br /> V.PIPE MONITORING IS PE USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> L CONTINUOUS MONITORING OFPIPE/ INCVIP{E THER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) Q!!// <br /> SECONDARY CONTAINMENT IS:%.D ❑ LI U FILL ❑c.PRESSURIZED ❑d.UNDER VACUUM 49P29 <br /> PANEL MANUFACTURER: - °90.1° i MODEL#: 'N-i-C - 490-31 <br /> LEAK SENSOR MANUFACTURER: `r 490.32 49 33 <br /> Y22rA.Q� 4 MODEL#(S):� <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. a.YES b.NO 490-34 <br /> FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490'35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR$2636) 4y 36 <br /> MLLD MANUFACTURER(S): °90-30 MODEL 4(S) 490.38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636). 490-39 <br /> ELLD MANUFACTURERS) °90-00 1 MODEL#(S): 490-41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g,p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. J9042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490'°3 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49049 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490.4649041 <br /> Lj 5.VISUAL PIPE MONITORING. <br /> FREQUENCY [I a.DAILY C] b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 490.48 <br /> 'Alloxxd fm mwtlmri of wbunW mer enc� meral9r fuel i n 00 er HSC 25281.5(bNA 49049 <br /> ❑ .SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> 1 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490- <br /> ❑ <br /> 99.OTHER(Specify) 49o-52 <br /> 490-s3 <br /> UPCF UST-D(12/2007)1/4 <br />