Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 40,s4a <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54b <br /> NO DISPENSERS 099.OTHER(Specify): <br /> PANEL MANUFACTURER: 40045 1 MODEL#: 490,56. <br /> LEAK SENSOR MANUFACTURER: 490-3 MODEL#(S): 490-5e <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 49x59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 49060. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 49o-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS [][.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 4906aa <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: LJLLIQUID ❑2.PRESSURE_❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 49o-64b <br /> VD.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490:5. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br /> ES2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36MONTHS. 49046 <br /> 'A3.SPILL BUCKETS ARE TESTED ANNUALLY. 490:7 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenmce records are kept for this facility: <br /> IN Alarm logs 49"a ❑Visual Inspection Records 490-666 ❑Tank integrity testing results 490:8c <br /> ❑SIR testing results(and supporting documentation records). 490-63d ❑ Tank gauging results(and supporting documentation records). 490-6ae <br /> ❑ATG Testing results(and supporting documentation records).490 66f ❑ Corrosion Protection 60-day logs 4%sgg <br /> Equipment maintenance and calibration records. 490:sh <br /> LX.TRAINING <br /> ersonnel with UST monitoring responsibilities are familiar withal of the following documents relevant to their job duties. wo.69a <br /> RENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)4906% <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)4ww <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-694 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-6x <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49 69f <br /> ❑ S WRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49069,, <br /> ❑ OTHER(Specify):M69b,M69i <br /> %This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.49 70 <br /> X. COMMENTSIADDFHONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to is plan.490,11 <br /> srrE IR&� /4 k2� ��+-� Aa oYkA-F-I w <br /> l4 tt.. aNL <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME 490.72 TITLE 49x73 <br /> NAME 49o-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> ML OWNERIOPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the inform 'on provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT S URE 490-76 DATE: 090-01 <br /> RERR NQ Q I ner/ itv erl enter CI 3.AmM1orieed Re enlaive of con <br /> APPLICANT NA nnt): J90,ts APPLICAN LE: 4".7' <br /> UPCF UST-D(12/2007)3/4 <br />