Laserfiche WebLink
F. In -Tank G tuging I SIR Equipment: • ® Check this box if tank gauging used only for inventory control. <br />❑ Check this box it no tank gauging or SIR equipment is installed. <br />This section mui t be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />¢I.nnLll¢I <br />❑ <br />Yes <br />❑ No' <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all items on the equipment manufacturer's maintenance Checklist completed? <br />Section H, below, des ribe how and when these deficiencies were ul will ue <br />e Leak Detectors (LLD : ❑ Check this box if LLDs are not installed. <br />n Sr <br />a <br />ollowln checklist: <br />to <br />euipmentcertification, was a leak simulated to verity LLD performance? (Check all that apply)NIA <br />No' <br />For equipment start-up or annual <br />Simulated leak rate: ®3g.p.h.; ❑ 01 g.p.h ; ❑0.2g.p.h.No' <br />Were all LLDs Confirmed operational and accurate within regulatory requiremenis7No' <br />FComleie <br />Was the testing apparatus properly calibrated? <br />No' <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />NIANo' <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />LLDs, does the turbine automatically shut off if any portion of the system is disabled or disconnected? <br />❑ Yes <br />No' <br />For electronic <br />N/A <br />LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a lest? <br />❑ Yes <br />No' <br />For electronic <br />N/A <br />❑ Yes <br />No' <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />NIA <br />® Yes <br />No' <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />n Sr <br />a <br />