Laserfiche WebLink
UST System N <br />INSPECTIONS: <br />2K87 Oct <br />1 OK92 Oct <br />7/6/99 Witnessed soap test on the primary piping. Primary was tested at 50 psi and held for 40 min. VR lines and vents <br />lines were tested at 5 and held for 40 min. <br />7/7/99 Witnessed the soap test on the 2° piping. Line were tested at 5 and held for one hour. <br />Witnessed the slope on the lines. Lines have slopes of/: -1/2. <br />Began the lake test. <br />Two flex connectors in the piping sumps will be changed due to air bubbles. <br />(Z,, , Ll P cs = S (.p hJ,-t S w t I I n -ort ('e- vs.� <br />