My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
2300 - Underground Storage Tank Program
>
PR0231341
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2021 11:07:38 AM
Creation date
11/5/2018 3:46:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231341
PE
2361
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\501\PR0231341\INSTALL PLAN 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/09/1995 15:07 7146795420 EHS ARCO LA P-1-119 PAGi 02 <br />MONITORING AND RESPONSE PLAN - X <br />ARCO PRODUCTS COMPANY FACILITY WITH <br />SECONDARY CONTAINMENT OF <br />UNDERGROUND STORAGE TANKS & PRODUCT LINES WITII <br />SUBMERSIBLE PUMP SHUTDOWN <br />ARCO Facility: i4 Address: -SU <br />This plan is designed to meet the monitoring and response requirements of Section 2632, Articic 3, <br />Title 23, CCR <br />acelay sola s o <br />Secondarily contained storage tanks and lines at this facility are monitored by a continuous <br />electronic leak detection system which consists of an alarm panel, sensors and associated <br />electronics. Liquid sensors are installed in the annular space of each double wall tank and <br />product line piping sump. Whenever a sensor detects the presence of a liquid there is both a <br />visual and audible alarm at the control panel. In addition, the continuous monitor on the <br />product piping system will shut down the pump and activate the alarm system when a <br />release is detected or if the continuous product piping monitoring system fails or is <br />disconnected, the pumping system will shirt down. <br />Automatic line leak detectors are installed on the secondarily contained pressurized product <br />piping. The line leak detector will detect a loss of pressure in the product lines and restrict <br />the flow of product. <br />2. MAINTENANCE SCHEDULE OF MONITORING EQUIPMENT <br />The continuous electronicleak detection system including line leak detectors will be <br />inspected according to the manufacturer's instructions by an outside contractor once during <br />each calendar year. <br />3. ROUTINE MONITORING PROCEDURE <br />On a daily basis the facility operator shall: <br />A. Inspect the control panel for visual and audible alarm signals to confirm that <br />the unit is operating. <br />B. Inspect island and tank fill areas for signs of spillage or petroleum shecn. <br />C. Record the inspection observations on the Daily Visual Monitoring Log <br />(Form APPC-765: attached.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.