My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
2300 - Underground Storage Tank Program
>
PR0231341
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2021 11:13:17 AM
Creation date
11/5/2018 3:47:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231341
PE
2361
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\501\PR0231341\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f) All mobile equipment must be equipped with seat belts which must be worn by <br /> the operator at all times. <br /> g] All job site vehicles will be equipped with a service brake, parking brake and <br /> emergency brake system. <br /> B. In the event of open excavations, which is a hazard to on-site workers, <br /> the following policy regarding excavations will be followed: <br /> a) Entry into excavations greater than 4 feet deep is prohibited, unless the <br /> requirements of T8 CCR 1541 are met. <br /> b] Hazards associated with general construction may occur during the course of <br /> construction. Personnel should be alert and prevent as well as avoid these <br /> hazards. <br /> c) When tank removal is part of scope of work,there is a significant potential for <br /> hazards from falling loads when lifting and removing tanks. Workers must be <br /> especially alert to this hazard. <br /> C. During general construction activities, there is also a potential for general <br /> (construction type) safety hazards. This plan does not address general safety in <br /> detail, If personnel are frequently reminded and will cooperate in being <br /> courteous, careful, alert, and thoughtful of outlines safety procedures, and if <br /> they use common sense in actions and in considering probable consequences, <br /> much will already have been accomplished to insure a safe working environment. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.