My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
COMPLIANCE INFO 2006 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2021 4:57:32 PM
Creation date
11/5/2018 3:55:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2007
RECORD_ID
PR0231349
PE
2351
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\800\PR0231349\COMPLIANCE INFO 2006 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2007
QuestysRecordDate
2/16/2018 6:39:17 PM
QuestysRecordID
3798594
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> llI <br /> UNDERGROUND STORAGE IANK i <br /> MONITORING PLAN- PAGE 1 <br /> FID <br /> ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mot 1 <br /> j <br /> ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY Moz ! <br /> I <br /> ❑ IHIS PLAN COVERS ONLY IHE FOLLOWING US I SYSTEM(S): <br /> I. FAGIII'I'Y IIVFOI�lYIATION. <br /> n Usec1 Only) <br /> FACILITYNAME ARCO#02076 Moa <br /> FACILITYsrrEADDRESS #800 E..KETTLEMAN LANE M04 CITY LODI Mos <br /> II:, E FIPIVIENYTESTING AND PREVIi1NTIVE}MAINTENANCE <br /> I <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g,sensors,probes,line leak detectors,etc}be perfom►ed in M06 <br /> accordance with the equipment manufacturers'instructions,.or annually,whichever is more frequent Such work must be performed by qualified personnel <br /> MONIIORING EQUIPMENT IS SERVICED ® I.ANNUALLY ❑ 99.OTHER(Specify): Mol , <br /> III: MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i a,location of each sensor <br /> line leak detector,in, <br /> system control panel,etc) If you already have a diagram(e g,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map et,. which shows all re aired information include it with this plan. <br /> IV TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) i-1 <br /> ® 1 CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(IN IERS TIT IAL)SPACE(S)OR SECONDARY CONTAINMENT VAUL T(S) <br /> SECONDARY CONTAINMENT IS: ® a DRY ❑ b LIQUID FILLED ❑ c UNDER PRESSURE ❑ d UNDER VACUUM M11 <br /> PANEL MANUFACTURER: Veeder Root M12 MODEL#: ILS 350 M13 <br /> LEAK SENSOR MANUFACTURER: Veeder Root M14 MODEL#(S): 794-390-407 M15 <br /> ❑ 2 AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(Sl <br /> PANEL MANUFACTURER: M16 MODEL#: M17 <br /> IN-TANK PROBE MANUFACTURER: Mts MODEL#(S): MI9 <br /> LEAK TEST FREQUENCY: ❑ a CONTINUOUS ❑ b DAILY/NIGHTLY ❑ c WEEKLY M20 <br /> ❑ d MONTHLY ❑ e OTHER(Specify): M21 <br /> PROGRAMMED TESTS: ❑ a 0 1 gp h ❑ b 0 2 g p h ❑ c OTHER(Specify): M22 M23 <br /> ❑ 3 INVENTORY RECONCILIATION ❑ a MANUAL PER 23 CCR§2646 ❑ b STATISTICAL PER 23 CCR§26461 M24 <br /> ❑ 4 WEEKL Y MANUAL I ANK GAUGING(MT G)PER 23 CCR§2645 <br /> TESIING PERIOD: ❑ a 36 HOURS ❑ b 60 HOURS M25 <br /> ❑ 5 INTEGRITY TESIING PER 23 CCR§2643 1 <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b BIENNIALLYM276 VISUAL MONITORING DONE: <br /> ❑ ❑ c OTHER(Specify): M26 M <br /> ❑ a DAILY ❑ b WEEKLY(Requires agency approval) <br /> ❑ <br /> 99.OTHER(Specify): <br /> M28 <br /> V. PIPE MONI'T'ORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao <br /> ® I CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/IRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a DRY ❑ b LIQUID FILLED ❑ c UNDER PRESSURE ❑ d UNDER VACUUM M31 <br /> PANEL MANUFAC I URER: Veeder Root M32 MODEL#: ILS 350 1033 <br /> LEAK SENSOR MANUFACTURER: Veeder Root M34 MODEL#(S): 791-380-323 M35 <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i e,TURBINE)SHUIDOWN? ® a YES ❑ b NO M16 <br /> WILL,FAIL URE/DISCONNECTION OF IHE MONIIORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? N a YES ❑ b NO M31 <br /> ❑ 2 MECHANICAL LINE LEAK DEIECTOR (MLLD) THAI ROUTINELY PERFORMS 3 0 g ph LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLDMANUFACTURER(s): Mas MODEL#(S): M39 <br /> ® 3 ELECIRONIC LINE LEAK DEIECTOR(ELLD)THAT ROUTINELY PERFORMS 3 0 g p h LEAK IESIS <br /> ELLD MANUFACTURER: VEEDERROOT M4. MODEL# PLLD M41 <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a MINIMUM MONTHLY 0 2 g p h ❑ b MINIMUM ANNUAL 0 l g p h M42 <br /> WILL ELID DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a YES ❑ b NO M43 <br /> WILL ELLD FAIL URE/DISCONNEC'IION IRIGGER AUTOMATIC PUMP SHUIDOWN? ® a YES [I b NO M44 <br /> ❑ 4 INTEGRIIY TESTING <br /> TESTFREQUENCY: ❑ a ANNUALLY ❑ b EVERY YEARS ❑ e OTHER(Specify) M45 M46 <br /> ❑ 5 VISUAL MONITORING DONE: ❑ a DAILY ❑ b WEEKLY* <br /> ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** Mal. <br /> Requires agency approval •'Allowed for monitoring of unburied emergency generator Poe]piping only per HSC§25281 5(b)(3) _ <br /> ❑ 6 PIPING IS SUCTION PIPING MEETING ALL REQUIREMENIS FOR EXEMPTION FROM MONIIORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCI OR REMOTE FILL PIPING IS CONNECTED TO IHE USI(s) <br /> ❑ 99.OIHER(Specify) <br /> M48 <br /> Arco#02076 Belshire Environmental Services Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.